Laserfiche WebLink
SCOPE OF SERVICES <br />Project Description <br />The City of San Leandro annually allocates funds toward street maintenance and rehabilitation. The Annual <br />Street Overlay / Rehabilitation 2018-19 project will repair and replace pavement on several city streets with <br />pavement in poor and failed condition. ADA upgrades triggered by the work will be included in the project. <br />This contract is for design of the improvements and preparation of construction documents suitable for <br />public bidding. Construction will be done by an outside contractor selected via a public competitive bid <br />process. <br />Description of Work <br />Consultant will provide design services listed below for following streets: <br />Street Name <br />Start Location <br />End Location <br />Street Classification <br />PCI <br />Aladdin Ave <br />Alvarado Street <br />East End Cul De Sac <br />Collector <br />0 <br />Bancroft Ave <br />Juana Ave <br />Blossom Ave <br />Arterial <br />41 <br />Benedict Court <br />Benedict Ave <br />East End Cul De Sac <br />Residential <br />1 <br />Bigge Street <br />Adams Ave <br />N. City Limits <br />Collector <br />33 <br />Corvallis Street <br />Farnsworth Street <br />Ottawa Ave <br />Residential <br />19 <br />Farallon Drive <br />Doolittle Drive <br />Griffith Street <br />Collector <br />35 <br />Graff Court <br />Graff Ave <br />South End Cul De Sac <br />Residential <br />23 <br />Grand Ave <br />Joaquin Ave <br />Sybil Ave <br />Collector <br />31 <br />Halcyon Drive <br />Washington Ave <br />Hes erian Blvd <br />Arterial <br />46/61 <br />Lafayette Ave <br />Lorraine Blvd <br />California Ave <br />Residential <br />28 <br />Marina Blvd <br />Neptune Drive <br />Doolittle Drive <br />Collector <br />6 <br />Mendocino Court <br />Mendocino Ave <br />East End Cul De Sac <br />Residential <br />23 <br />Mendocino Street <br />Burkhart Ave <br />Randy Street <br />Residential <br />23 <br />Pansy Street <br />Terra Ave <br />Lillian Ave <br />Residential <br />3 <br />Purdue Street <br />Farnsworth Street <br />Zelma Street <br />Collector <br />36 <br />Rosewood Court <br />Belleview Drive <br />South End Cul De Sac <br />Residential <br />23 <br />Thornton Street <br />Alvarado Street <br />Barricade at Dead End <br />I Residential <br />2 <br />Williams Street <br />Aurora Drive <br />Doolittle Drive <br />I Collector <br />5 <br />Task 1: Preliminary Investigation <br />Objective: In this initial phase of work, Consultant will investigate the extent and perform field studies <br />necessary to understand the existing conditions. The data collected will help define site constraints, confirm <br />budget, and establish the scope of work necessary to repair the streets identified. <br />1.1 Kickoff Meeting: Consultant will meet with the City to discuss project parameters and to review <br />strategies and possible scope refinement based on gathered information from public agencies and site <br />Consulting Services Agreement between City of San Leandro and Last revised 06/28/2018 <br />BKF Engineers, Inc. for Annual Street Overlay/Rehabilitation 2018-19 <br />COSL Project No. 2019.0050 Exhibit A — Page 1 of 6 <br />