My WebLink
|
Help
|
About
|
Sign Out
Home
10B Action 2019 0506
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2019
>
Packet 2019 0506
>
10B Action 2019 0506
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2019 2:36:39 PM
Creation date
4/30/2019 3:19:13 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
5/6/2019
Retention
PERM
Document Relationships
Reso 2019-084
(Approved)
Path:
\City Clerk\City Council\Resolutions\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
26 | Final Report Bay Area Clean Water Agencies | City of San Leandro Table 8-1. Projected Greenhouse Gas Emissions Parameter Unit Optimization Dry Season1 Optimization Year Round1 Level 2 Dry Season1 Level 2 Year Round1 Level 3 Dry Season1 Level 3 Year Round1 Sidestream Year Round GHG Emissions Increase from Energy MT CO2/yr 570 610 1,650 1,760 1,680 1,800 44 GHG Emissions Increase from Chemicals MT CO2/yr 50 50 20 30 340 360 1 GHG Emissions Increase Total MT CO2/yr 620 660 1,680 1,790 2,020 2,150 45 Unit GHG Emissions2 lb CO2/MG 700 800 1,300 1,400 1,500 1,600 54 Unit GHGs for Ammonia Removal2,3,5 lb GHG/lb N 3 3 7 7 6 7 0.9 Unit GHGs for Total N Removal2,3 lb GHG/lb N 12 10 11 11 11 10 0.9 Unit GHGs for Total P Removal2,4 lb GHG/lb P --* 50 70 70 60 60 0.3 1. Dry Season = facilities sized for May 1 through September 30 loads but operate year round; year round = facilities sized for year round loads and operated year round. 2. The GHG Emissions are based on the flow and load reduction average over the project. The average flow and nutrient load reduction over the 10-year project duration for optimization and 30-year project duration for sidestream and upgrades. 3. Based on ammonia/nitrogen removal only. 4. Based on phosphorus removal only. * The plant is not removing additional phosphorus load during for the dry season optimization.
The URL can be used to link to this page
Your browser does not support the video tag.