such as wetting, daily roadwashing and other maintenance functions to control <br />emissions, shall be implemented at all times during outdoor construction. Dust <br />generating activities such as excavation, paving etc., shall be scheduled in the early <br />morning and other hours when wind speeds are low. All construction contracts shall <br />include the following requirements: 1) unpaved construction sites shall be sprinkled <br />with water at least twice per day; 2) trucks hauling construction materials shall be <br />covered with tarpaulins or other effective covers; 3) streets surrounding demolition <br />and construction sites shall be swept at least once per day; and 4) paving and <br />planting shall be done as soon as possible. City shall charge Applicant or <br />Developer, and Applicant or Developer shall pay, for all costs of sweeping city <br />streets in the vicinity of the project as necessary to control dust and spillage. <br />E. Construction workers on the project shall be provided a portable toilet as a <br />minimum sanitary facility for use during all phases of construction. Said portable <br />toilet shall be screened from view from the public right-of-way or located to the <br />interior or rear of the site. <br />F. The Applicant shall prepare a construction truck route plan that would restrict <br />trucks to arterial streets that have sufficient pavement section to bear the heavy <br />truck traffic, thereby minimizing noise and traffic impacts to the community. The <br />construction truck route plan shall be reviewed and approved by the City <br />Engineering and Transportation Department prior to receipt of the grading permit. <br />G. Truck hauling activities shall be restricted to 8:00 a.m. to 5:00 p.m., unless otherwise <br />approved by the City Engineer. <br />H. The property shall be secured during demolition and construction with a six (6) foot <br />tall chain link fence and any other security measures in accordance with <br />recommendation of the San Leandro Police Department. <br />Project construction contractor shall comply with the current Bay Area Air Quality <br />Management District (BAAQMD) Best Management Practices for reducing <br />construction emissions. <br />J. Project construction contractor shall ensure that all nonessential idling of <br />construction equipment is restricted to five minutes or less in compliance with the <br />California Air Resources Board (CARB) Rule 2449. <br />IX. GENERAL CONDITIONS <br />A. The project site shall be well maintained and shall be kept free of litter, debris and <br />weeds at all times; during construction, the site shall be well maintained and shall <br />be kept free of litter, debris and weeds. <br />B. All landscaping shall be maintained in a healthy, growing condition at all times. <br />Any damaged or dead plant material shall be promptly replaced with a plant <br />material similar in type and comparable in size to the plant(s) being removed. Any <br />landscaping shall be maintained so as not to interfere or obstruct the public right - <br />Agreement to Conditions May 2, 2019 <br />PLN 18-0086 Page 10 of 12 <br />