My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2020-035
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2020
>
Reso 2020-035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2020 12:34:14 PM
Creation date
4/28/2020 12:19:21 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
4/20/2020
Retention
PERM
Document Relationships
8C Consent 2020 0420
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2020\Packet 2020 0420
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Meetings and Workshops: <br />• Draft Predesign Report Review Workshop <br />LEE & RO Deliverables: <br />• Meeting agenda, presentation handouts, meeting minutes, and decision log. <br />• Draft and Final Predesign Report (pdf) <br />Information Provided by City: <br />• Existing information and as -built drawings related to the project elements <br />• Input at the meeting <br />• Review comments on the Draft Predesign Report <br />Task 3: Design Develo mu ent (,65%. 90% and 100% Submittal): LEE & RO shall prepare <br />65%, 90% and 100% separate submittal packages for the SE Line Project and the Davis St. <br />Manhole project. Each submittal package shall include technical specifications, drawings, <br />cost estimate, and preliminary construction schedule. Each submittal will be prepared by <br />including additional details to the design documents to progress the design and City's review <br />comments on the previous submittal. <br />LEE & RO Deliverables: <br />• Meeting agenda, presentation handouts, meeting minutes, and decision log. <br />• 65%, 90% and 100% Plans and Specifications (Excel Probable cost of construction <br />and preliminary construction schedule witheach progress submittal. <br />Information Provided by City: <br />• One collated set of marked up drawings and specifications within 2 weeks of receipt of <br />the progress design submittal <br />Task 4: Final Design (Bid Set): LEE & RO shall prepare the two bid sets (final <br />submittal packages). The bid sets will include applicable City's comments on the <br />100% design submittal. The bid sets will include appropriate registration stamps and <br />signatures. <br />Consulting Services Agreement between City of San Leandro and Last revised 02/28/2020 <br />Lee & Ro for SE Line Replacement and Davis St. Manhole Replacement Exhibit A — Page 5 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.