My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2020-119 1388 Bancroft Apartments MND MMRP
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2020
>
Reso 2020-119 1388 Bancroft Apartments MND MMRP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2020 4:10:56 PM
Creation date
10/8/2020 3:46:36 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
9/21/2020
Retention
PERM
Document Relationships
5A Public Hearings 2020 0921
(Approved by)
Path:
\City Clerk\City Council\Agenda Packets\2020\Packet 2020 0921
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
381
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.0 ENVIRONMENTAL CHECKLIST <br />• Idling times shall be minimized either by shutting equipment off when not in <br />use or reducing the maximum idling time to 5 minutes (as required by the <br />California airborne toxics control measure, Title 13, Section 2485 of the <br />California Code of Regulations). Clear signage shall be provided for <br />construction workers at all access points. <br />• All construction equipment shall be maintained and properly tuned in <br />accordance with manufacturers' specifications. All equipment shall be <br />checked by a certified visible emissions evaluator. <br />A publicly visible sign shall be posted with the telephone number and <br />person to contact at the City regarding dust complaints. This person shall <br />respond and take corrective action within 48 hours. The air district's phone <br />number shall also be visible to ensure compliance with applicable <br />regulations. <br />Timing/Implementation: Prior to issuance of building permits and during <br />grading and construction <br />Enforcement/Monitoring: City of San Leandro Community Development <br />Department <br />MM AQ-2 During construction activities, the project applicant and/or its contractor shall <br />ensure that all diesel -powered off -road construction equipment with more than <br />50 horsepower is EPA Tier 4 certified or retrofitted with a CARB-verified level 3 <br />diesel particulate filter. Prior to issuance of a grading permit, the City shall <br />ensure that grading plan notes include this requirement. The City shall monitor <br />compliance by requiring the applicant's contractor to provide written <br />verification during construction. <br />Timing/Implementation: Prior to issuance of building permits and during <br />grading and construction <br />Enforcement/Monitoring: City of San Leandro Community Development <br />Department <br />1388 Bancroft Avenue Project <br />Initial Study/Mitigated Negative Declaration <br />City of San Leandro <br />November 2018 <br />3.0-22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.