My WebLink
|
Help
|
About
|
Sign Out
Home
CSA Ethosoft 09252020
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2020
>
CSA Ethosoft 09252020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2020 9:23:27 AM
Creation date
11/18/2020 9:22:53 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
9/25/2020
Retention
PERM
Document Relationships
Reso 2020-109 903 CSA Ethosoft Inc for Laboratory Information Mgmt System
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Consulting Services Agreement between City of San Leandro and Last revised June 26, 2020 <br />Ethosoft, Inc. for Laboratory Information Man agement System Exhibit A – Page 1 of 10 <br /> <br />EXHIBIT A <br /> <br />SCOPE OF SERVICES <br /> <br />Introduction <br /> <br />This Scope of Services defines the scope of work to be accomplished by Ethosoft under the terms and <br />conditions of the contract for the Laboratory Information Management System (LIMS) Project between the <br />City of San Leandro Water Pollution Control Plant Laboratory (referred to herein as “the City”) and Ethosoft, <br />Inc. The tasks to be performed by Ethosoft are defined (see Section B, Ethosoft Responsibilities) as are <br />the activities to be performed by the City (see Section C, San Leandro Responsibilities). If major changes <br />to this Scope of Services are identified, they will be processed in accordance with the plan described in <br />Section D, "Project Change Control Plan". The analysis and implementation of changes may result in <br />modifications to the Estimated Schedule, additional charge s to the City, or other terms of this Scope of <br />Services. <br /> <br />The Scope of Services includes the following subsections: <br /> <br />A. Scope of Services <br />B. Ethosoft Responsibilities and Project Plan <br />a. Deliverables <br />b. Completion Criteria <br />C. San Leandro Responsibilities <br />D. Project Change Control Plan <br />E. Escalation Procedures <br />F. Description of Cloud Services <br /> <br /> <br />A. Scope of Services <br /> <br />The scope of the project is to establish a fully functional Cloud X -LIMS system that will be implemented for <br />the laboratory to provide a comprehensive solution that will meet the requirements of the City. This system <br />will be used by the City’s laboratory technicians and managers to perform sample analysis, verification, track <br />lab supplies and provide reporting. <br /> <br />Phased Approach <br />A detailed description of Ethosoft’s 7-phased implementation process is outlined below: <br />Phase I: Project Organization -- The first phase is to get the project organized. During this phase, the project <br />scope is reviewed with the City’s project manager and there is a project kick off meeting to spell out roles, <br />responsibilities, and lines of communication during the project. Weekly Status meetings are scheduled during <br />this phase. A high-level schedule is prepared at the end of this phase. <br />DocuSign Envelope ID: 0FAAC8A1-7B66-41D1-8DBF-9ED853BC0612
The URL can be used to link to this page
Your browser does not support the video tag.