My WebLink
|
Help
|
About
|
Sign Out
Home
8I Consent 2021 0405
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2021
>
Packet 2021 0405
>
8I Consent 2021 0405
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2021 6:02:25 PM
Creation date
3/31/2021 6:02:12 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
4/5/2021
Retention
PERM
Document Relationships
Reso 2021-049 CSA Fehr and Peers
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Consulting Services Agreement between City of San Leandro and Last revised 03/22/2021 <br />Fehr & Peers for Crosstown Class IV Corridor Study Exhibit A – Page 7 of 9 <br />Deliverables <br />o Draft and final conceptual design plans in CAD and PDF at 1:50 scale, <br />one per corridor <br />o Draft and final cost estimate, one per corridor <br />3.3 Traffic Modeling and Conceptual Design Alternatives <br />The Consultant will develop Synchro models for each corridor at up to 11 total <br />study intersections during the AM and PM peak hours on a typical weekday. <br />These models will be used to establish baseline conditions for traffic – and on <br />Bancroft Avenue bus operations – and to evaluate the operational changes <br />associated with the proposed Class IV separated bikeways in up to two plus <br />project scenarios. The plus project scenarios will likely focus on modifications to <br />lane configurations, potential safety countermeasures, and signal timing <br />optimizations. <br />To supplement the intersection operations analysis, the Consultant will conduct <br />field visits on the day of the traffic counts when school is in session. The <br />Consultant will observe operations, including queuing at major driveways (e.g., at <br />school sites) and other unsignalized locations. <br />The Consultant will work closely with the City to develop two (2) class IV <br />separated bikeway concept alternatives for each corridor for a total of four (4) <br />concept alternatives. Each alternative will include: a sample two-block illustrative <br />plan showing signalized and unsignalized intersections, up to four (4) cross <br />sections, and a photo simulation/rendering of the typical design. <br />Deliverables <br />o Draft and final traffic operations memo with technical appendices (for <br />traffic counts and project scenarios), one per corridor <br />o Two (2) conceptual design alternatives, one per corridor <br />o Draft and final alternatives analysis memo, one per corridor <br />3.4 Draft Crosstown Class IV Corridors Study <br />The Consultant will determine a preferred design alternative for each corridor <br />based on the discussion of preferred design alternatives in the first round of open <br />houses. The Draft Crosstown Class IV Corridors Study will include all aspects of <br />the process and study. The Study will be prepared to be presented for public <br />comment and feedback from relevant committees and stakeholders. <br />Deliverables <br />o Administrative draft of Crosstown Class IV Corridor Study <br />o Public draft of Crosstown Class IV Corridor Study <br />3.5 Final Crosstown Class IV Corridors Study <br />100
The URL can be used to link to this page
Your browser does not support the video tag.