BID SUMMARY
<br />
<br />Pedestrian Hybrid Beacon
<br />FEDERAL PROJECT NO.:HSIP 5041(045)
<br />BID OPENING
<br />DATE: March 17, 2021 Date Approved: 2/18/2021
<br />TIME: 3:30 p.m.Prepared by:N. Castelino
<br />LOCATION: City Clerk's Office
<br />ITEM
<br />NO.ITEM UNIT COST ITEM COST
<br />1 Mobilization 1 LS $40,000.00 $40,000.00
<br />2 Traffic Control 1 LS $40,000.00 $40,000.00
<br />3 HAWK Signal 1 LS $170,000.00 $170,000.00
<br />4 Signal Interconnect 1 LS $25,000.00 $25,000.00
<br />5 Signing and Striping 1 LS $20,000.00 $20,000.00
<br />TOTAL BASE BID:
<br />REQUIRED DOCUMENTATION:
<br />SUBCONTRACTORS:
<br />NOTES:
<br />Date:
<br />Nicole Castelino, Project Manager
<br />Date:
<br />Austine Osakwe, Senior Engineer
<br />San Leandro Local Business
<br />Addendum #1
<br />DBE 6% GOAL OR GFE
<br />$295,000.00
<br />ENGINEER'S ESTIMATE
<br />Reviewed by:
<br />Reviewed by:
<br />PROJECT TITLE:
<br />PROJECT NO.:
<br />BID NO.:
<br />QUANTITY
<br />Davis Street and Caprentier Street
<br />2016.0550
<br />20-21.009
<br />Bid Bond
<br />
<br />Gruendl Inc, DBA Ray's Electric W. Bradley Electric, Inc.Radman Electric
<br />411 Pendleton Way, Suite B 90 Hill Road 25013 Whitman Street
<br />Oakland, CA 94621 Novato, CA 94945 Hayward, CA 94544
<br />Phone: (5100 577-7700 Phone: (415) 898-1400 Phone: (510) 755-8369
<br />Fax: (510) 577-7706 Fax: (415) 898-5991 Fax:
<br />UNIT COST UNIT COST UNIT COST
<br />$25,000.00 $25,000.00 $4,100.00 $4,100.00 $39,200.00 $39,200.00
<br />$30,000.00 $30,000.00 $11,396.00 $11,396.00 $30,000.00 $30,000.00
<br />$198,000.00 $198,000.00 $226,000.00 $226,000.00 $220,000.00 $220,000.00
<br />$43,000.00 $43,000.00 $60,127.00 $60,127.00 $91,800.00 $91,800.00
<br />$12,000.00 $12,000.00 $11,750.00 $11,750.00 $11,000.00 $11,000.00
<br />CMC Traffic Control Super Seal & Stripe Chrisp Company
<br />Super Seal & Stripe Site Safe Traffic
<br />Bailey's Trenchless, Inc.
<br />ITEM COST
<br />Construction H, Inc.California Utility Tight Access Excavation
<br />ITEM COST ITEM COST
<br />$308,000.00 $313,373.00
<br />YES
<br />YES YES
<br />N/A
<br />YES
<br />This document is a summary of bids received for the subject project and are
<br />provided only as a convenience. Listing of a particular bid is not a finding that
<br />such bid has been found to be responsive or accepted as complete by the City.
<br />An award of contract, if any, is subject to approval of the City Council and/or the
<br />City Manager. Contractors should refer to the contract documents for bidding
<br />information.
<br />$392,000.00
<br />YES
<br />YES
<br />N/A N/A
<br />YES
<br />Davis St-Carpentier St Pedestrian Hybrid Beacon.xlsx Page 2 of 2 Printed 3/18/2021 @ 11:16 AM
<br />March 18, 2021
<br />3/18/21
<br />93
|