Laserfiche WebLink
BID SUMMARY <br /> <br />Pedestrian Hybrid Beacon <br />FEDERAL PROJECT NO.:HSIP 5041(045) <br />BID OPENING <br />DATE: March 17, 2021 Date Approved: 2/18/2021 <br />TIME: 3:30 p.m.Prepared by:N. Castelino <br />LOCATION: City Clerk's Office <br />ITEM <br />NO.ITEM UNIT COST ITEM COST <br />1 Mobilization 1 LS $40,000.00 $40,000.00 <br />2 Traffic Control 1 LS $40,000.00 $40,000.00 <br />3 HAWK Signal 1 LS $170,000.00 $170,000.00 <br />4 Signal Interconnect 1 LS $25,000.00 $25,000.00 <br />5 Signing and Striping 1 LS $20,000.00 $20,000.00 <br />TOTAL BASE BID: <br />REQUIRED DOCUMENTATION: <br />SUBCONTRACTORS: <br />NOTES: <br />Date: <br />Nicole Castelino, Project Manager <br />Date: <br />Austine Osakwe, Senior Engineer <br />San Leandro Local Business <br />Addendum #1 <br />DBE 6% GOAL OR GFE <br />$295,000.00 <br />ENGINEER'S ESTIMATE <br />Reviewed by: <br />Reviewed by: <br />PROJECT TITLE: <br />PROJECT NO.: <br />BID NO.: <br />QUANTITY <br />Davis Street and Caprentier Street <br />2016.0550 <br />20-21.009 <br />Bid Bond <br /> <br />Gruendl Inc, DBA Ray's Electric W. Bradley Electric, Inc.Radman Electric <br />411 Pendleton Way, Suite B 90 Hill Road 25013 Whitman Street <br />Oakland, CA 94621 Novato, CA 94945 Hayward, CA 94544 <br />Phone: (5100 577-7700 Phone: (415) 898-1400 Phone: (510) 755-8369 <br />Fax: (510) 577-7706 Fax: (415) 898-5991 Fax: <br />UNIT COST UNIT COST UNIT COST <br />$25,000.00 $25,000.00 $4,100.00 $4,100.00 $39,200.00 $39,200.00 <br />$30,000.00 $30,000.00 $11,396.00 $11,396.00 $30,000.00 $30,000.00 <br />$198,000.00 $198,000.00 $226,000.00 $226,000.00 $220,000.00 $220,000.00 <br />$43,000.00 $43,000.00 $60,127.00 $60,127.00 $91,800.00 $91,800.00 <br />$12,000.00 $12,000.00 $11,750.00 $11,750.00 $11,000.00 $11,000.00 <br />CMC Traffic Control Super Seal & Stripe Chrisp Company <br />Super Seal & Stripe Site Safe Traffic <br />Bailey's Trenchless, Inc. <br />ITEM COST <br />Construction H, Inc.California Utility Tight Access Excavation <br />ITEM COST ITEM COST <br />$308,000.00 $313,373.00 <br />YES <br />YES YES <br />N/A <br />YES <br />This document is a summary of bids received for the subject project and are <br />provided only as a convenience. Listing of a particular bid is not a finding that <br />such bid has been found to be responsive or accepted as complete by the City. <br />An award of contract, if any, is subject to approval of the City Council and/or the <br />City Manager. Contractors should refer to the contract documents for bidding <br />information. <br />$392,000.00 <br />YES <br />YES <br />N/A N/A <br />YES <br />Davis St-Carpentier St Pedestrian Hybrid Beacon.xlsx Page 2 of 2 Printed 3/18/2021 @ 11:16 AM <br />March 18, 2021 <br />3/18/21 <br />93