Laserfiche WebLink
12  <br />  <br />Second, the Checklist fails to mention or justify the Project’s anticipated outdoor water use rate  <br />whatsoever. As such, we cannot verify the revised outdoor water use rates.   <br />These underestimations present an issue, as CalEEMod uses indoor and outdoor water use rates to  <br />estimate the amount of wastewater, which has direct emissions of GHGs.21 By including an  <br />underestimated indoor and outdoor water use rates, the model underestimates the Project’s water‐ <br />related operational emissions and should not be relied upon to determine Project significance.  <br />Unsubstantiated Changes to Wastewater Treatment System Percentages <br />Review of the CalEEMod output files demonstrates that the “Callan and E 14th Street Infill Checklist  <br />Project Operations” model includes several changes to the default wastewater system percentages (see  <br />excerpt below) (Appendix A, pp. 172‐173).   <br />  <br />As you can see in the excerpt above, the model assumes that 100% of the Project’s wastewater would  <br />be treated aerobically. As previously mentioned, the CalEEMod User’s Guide requires any changes to  <br />model defaults be justified.22 According to the “User Entered Comments and Non‐Default Data” table,  <br />the justification provided for these changes is: “assumes all indoor water and 100% aerobic treatment”  <br />(Appendix A, pp. 130). Furthermore, the Checklist states that “[p]roject‐generated sewage would be  <br />  <br />21 CalEEMod User Guide, available at: http://www.caleemod.com/, p. 44, 45.  <br />22 CalEEMod User Guide, available at: http://www.caleemod.com/, p. 2, 9  <br />127