Laserfiche WebLink
III. CONSTRUCTION PROVISIONS <br />A. In addition to the facility's regular and routine pest and vermin control measures, <br />such measures shall be extended and incorporated into the demolition and <br />construction of the expanded facility. <br />B. During construction, the following high standards for sanitation are required: <br />Garbage cans, construction dumpsters, and debris piles shall be removed on a <br />minimum weekly 'basis. All food related trash items such as wrappers, cans, <br />bottles, and food scraps shall be disposed of in closed containers only and shall <br />be regularly removed from the site. At no time shall debris remain on site <br />unattended within the front yard setback of the property. Inspections will be <br />conducted as part of the regular construction compliance, to ensure compliance <br />of the applicant and contractors with this requirement. Construction activity shall <br />not commence prior to 7:00 a.m. and shall cease by 7:00 p.m. Monday through <br />Friday, and construction activity shall not commence prior to 8:00 a.m. and shall <br />cease by 7:00 p.m. on Saturday and Sunday. No construction is permitted on <br />Federal holidays. As provided in the City of San Leandro's Noise Ordinance <br />(ORDINANCE NO. 2003-005), "construction" shall mean any site preparation, <br />assembly, erection, substantial repair, alteration, demolition or similar action, for <br />or on any private property, public or private right-of-way, streets, structures, <br />utilities, facilities, or other similar property. Construction activities carried on in <br />violation of this Article may be enforced as provided in San Leandro Municipal <br />Code Section 4-1-1130 and may also be enforced by issuance of a stop work <br />order and/or revocation of any or all permits issued for such construction activity. <br />Procedures with the highest noise potential shall be scheduled for daylight hours, <br />when ambient noise levels are highest. The contractor(s) shall be required to <br />employ the quietest among alternative equipment or to muffle/control noise from <br />available equipment. <br />C. Construction activity shall not create dust, noise or safety hazards for adjacent <br />residents and properties. Dirt and mud shall not be tracked onto Williams St. or <br />Marina Blvd. from the project site during construction. Standard construction dust <br />control procedures, such as wetting, daily road washing and other maintenance <br />functions to control emissions, shall be implemented at all times during outdoor <br />construction. Dust generating activities such as excavation, paving etc., shall be <br />scheduled in the early morning and other hours when wind speeds are low. All <br />construction contracts shall include the following requirements: 1) unpaved <br />construction sites shall be sprinkled with water at least twice per day; 2) trucks <br />hauling construction materials shall be covered with tarpaulins or other effective <br />covers; 3) streets surrounding demolition and construction sites shall be swept at <br />least once per day; and 4) paving and planting shall be done as soon as possible. <br />City shall charge applicant, and applicant shall pay, for all costs of sweeping city <br />streets in the vicinity of the project as necessary to control dust and spillage. <br />Agreement to Conditions May 7, 2020 <br />PLN19-0057 Page 6 of 13 <br />