My WebLink
|
Help
|
About
|
Sign Out
Home
9G Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2022
>
Packet 01182022
>
9G Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2022 9:40:30 AM
Creation date
4/1/2022 9:40:15 AM
Metadata
Fields
Template:
CM City Clerk-City Council
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
File Number: 22-004 <br />IV. Operations and Maintenance Program <br />V. Design and Performance Provisions <br />VI. Overflow Emergency Response Plan <br />VII.Fats, Oil and Grease Control Program <br />VIII. System Evaluation and Capacity Assurance Plan <br />IX. Monitoring, Measurement, and Program Modifications <br />X. SSMP Program Audits <br />XI. Communication Program <br /> <br />The SSMP requires local public sewer collection system agencies to self-audit at least every two <br />(2) years and update every five (5) years. The updated SSMP must be approved by the City <br />Council at a regular meeting. <br />Analysis <br />The SWRCB requires the City, as a collection system agency, to adopt and maintain an SSMP. <br />The agency’s governing body, in this case the City Council, must re-approve the agency’s SSMP <br />every five years. The most recent update was in January 2017, and staff performed an audit of the <br />plan in 2019. Staff reviewed the SSMP in December 2021 and updated it with current <br />information. Changes made to the plan are documented in Section 12, Record Keeping <br />Requirements. <br />The SSMP also includes a standalone Overflow Emergency Response Plan (OERP), originally <br />created in 2015. This plan provides procedures for staff to follow in response to a sewer overflow, <br />such as public notification and reporting requirements. Staff have reviewed the OERP and <br />verified it is still accurate, updating contact information as appropriate. <br />Previous Actions <br />·Resolution No. 2017-008, the City Council approved the updated SSMP on January 17, <br />2017 <br />·Resolution No. 2009-115, the City Council approved the SSMP on July 20, 2009 <br />·Resolution No. 2007-150, the City Council approved the development plan and schedule <br />for the SSMP on December 17, 2007 <br />Fiscal Impacts <br />Approval of the updated SSMP has no fiscal impact. <br />Attachment(s) to Related Legislative Files <br />Attached to Resolution: <br />o City of San Leandro Sewer System Management Plan Volume 1, Updated December <br />2021 <br />PREPARED BY: <br />Dean Wilson, Interim Water Pollution Control Manager <br />Page 2 City of San Leandro Printed on 1/14/2022 <br />85
The URL can be used to link to this page
Your browser does not support the video tag.