Laserfiche WebLink
December 8, 2021 <br />San Leandro Four (4) Ballpark Signs Replacement Project <br />Page 2 <br /> <br />S:\Proposals\PROPOSALS\CSG Consultant\San Leandro 4 Ballpark sign replacement_Proposal.doc <br />2. Site Electrician Support: ACEE to obtain electrician to support ACEE design electrical engineer <br />to confirm existing circuits are operational and locate existing power supply within proposed <br />site (Four sites of power source) when as-builts or equipment location are not available: <br />a. Qualified Electrician to access panel to confirm operation and circuits are live. Electrician <br />to clamp/test wires using Fluke meter to confirm energy status. <br />b. ACEE to site visit with electrician to determine source and operation of existing scoreboard <br />to be replaced. The intent to reuse existing circuits with adequate capacity in order to keep <br />cost down and replace existing scoreboards. <br />c. Electrician to assist with four (4) existing scoreboards and determine power source location <br />and capacity. <br /> <br />3. Electrical Power & Lighting Design: <br />a. Service Upgrade (NOT in Scope): <br />b. Main Switchboard (NOT in Scope): <br />c. PG&E Overhead Transmission Line (NOT in Scope): <br />d. Distribution/Panel Board (Base Scope): Provide and design (N) Distribution/Panel Board <br />to accommodate the power loads of the proposed scoreboard. Coordinate final electrical <br />loads with final equipment selection. <br />e. Scoreboard Power (Base Scope): Provide and design power and wiring requirements to <br />proposed wireless scoreboard. Provide summary loads for City review and permit. <br />Structural engineer to provide design of structural column required for the free-standing <br />scoreboard with new scoreboard paneling. <br />f. Scoreboard Control Console (Base Scope): Provide and design power outlet for proposed <br />scoreboard control console. Provide design for a Power cabinet with outlet to provide power <br />source for scoreboard control console. <br />g. Pathway/Security Lighting (NOT in Scope): <br />h. Irrigation equipment (NOT in Scope): <br />i. Restrooms Bldg (NOT in Scope): <br />j. Lift Station & Booster Pump equipment (NOT in Scope): <br />k. Parking Lot lighting (NOT in Scope): <br />l. Outdoor Convenience Outlets (NOT in Scope): <br />m. Flagpole Lighting (NOT in Scope): <br />n. Accent Exterior Lighting (NOT in Scope): <br />o. EV Charging (NOT in Scope): <br />h. Emergency Lighting Source (NOT in Scope): <br />3. Communication Design: <br />a. Scoreboard Communication Conduit Only (Base Scope): The proposed scoreboard is <br />assumed wireless scoreboard with wireless controls console. No hardwiring between <br />scoreboard and control console; however, empty conduit will be provided as base scope in <br />the future event the City converts to hard wiring. <br />b. Telephone System (NOT in Scope): <br />175