My WebLink
|
Help
|
About
|
Sign Out
Home
9C Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2022
>
Packet 02222022
>
9C Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2022 9:57:56 AM
Creation date
4/1/2022 9:57:54 AM
Metadata
Fields
Template:
CM City Clerk-City Council
Retention
PERM
Document Relationships
Reso 2022-035 Annual Street Overlay Acceptance 2018-2020
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
File Number: 22-018 <br />*$340,000 moved to Pedestrian Crossing 17-18 project via Resolution No. 2018-113. <br />**$900,000 moved to Street Overlay and Reconstruction 16-17 via Resolution No. 2018-080 and <br />$3,225,000 moved to Street Overlay and Reconstruction 17-18 via No. Resolution 2018-081. <br />***$720,000 reserved for use on Street Overlay and Reconstruction 19-21. <br />****These accounts are for traffic calming and sanitary sewer point repair programs; only the <br />value constructed by this project is listed. <br />Attachments to Staff Report <br />·Existing and Potential Change Orders <br />·Photos of Completed Work <br />PREPARED BY: Nick Thom, City Engineer, Engineering and Transportation Department <br />Page 4 City of San Leandro Printed on 3/17/2022
The URL can be used to link to this page
Your browser does not support the video tag.