Laserfiche WebLink
File Number: 22-092 <br />·Policy T-3.6 - Pedestrian Environment. Improve the walkability of all streets in San Leandro <br />through the planning, implementing, and maintaining of pedestrian supportive <br />infrastructure. <br />·Policy T-3.7 - Removing Barriers to Active Transportation. Reduce barriers to walking and <br />other forms of active transportation such as incomplete or uneven sidewalks, lack of <br />wheelchair ramps and curb cuts, sidewalk obstructions including cars parked on <br />sidewalks, trail gaps, wide intersections, and poor sidewalk connections to transit stops. <br />·Policy CSF-6.8 - Maintenance. Ensure that sufficient funding is provided for the ongoing <br />maintenance of City-owned facilities, including streets, streetlights, traffic signals, <br />landscaping, street trees, storm drains, public buildings, and other infrastructure. <br />Environmental Review <br />This project is categorically exempt from the California Environmental Quality Act (CEQA) per <br />Section 15301(c) of the CEQA guidelines. The Notice of Exemption was filed with the Alameda <br />County Recorder on September 27, 2019, and the City received no public objections to the <br />project within the statutory comment period. <br />Summary of Public Outreach Efforts <br />This project was advertised in the Daily Review on September 20, 2019, as well as in three other <br />newspapers with circulations that reflect San Leandro’s diversity. Staff also notified contractors <br />interested in working with the City and sent the Contract Book to local builder’s exchanges. <br />Prior to construction, the Contractor notified residents and businesses whose properties were <br />directly impacted by construction of the construction activities. <br />Fiscal Impacts <br />The construction costs are as described below: <br />Design, Site Investigation and Bid $74,280 <br />Construction Contract $1,172,980 <br />Contract Change Order $434,000 <br />Construction Management and Inspection $133,178 <br />Total $1,814,438 <br />Change Order Summary <br />Change Order limit authorized at contract award was 27% ($316,705). <br />CCO No.Description Amount % <br />1 Added scope for removal of street trees.$58,635 5% <br />2 Added scope for removal of street trees. $58,635 5% <br />Page 3 City of San Leandro Printed on 3/16/2022