My WebLink
|
Help
|
About
|
Sign Out
Home
9C Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2022
>
Packet 03212022
>
9C Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2022 12:13:28 PM
Creation date
4/1/2022 12:13:27 PM
Metadata
Fields
Template:
CM City Clerk-City Council
Retention
PERM
Document Relationships
Reso 2022-045 Spencon Contract Change Order Annual Sidewalk Repair
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
File Number: 22-092 <br />·Policy T-3.6 - Pedestrian Environment. Improve the walkability of all streets in San Leandro <br />through the planning, implementing, and maintaining of pedestrian supportive <br />infrastructure. <br />·Policy T-3.7 - Removing Barriers to Active Transportation. Reduce barriers to walking and <br />other forms of active transportation such as incomplete or uneven sidewalks, lack of <br />wheelchair ramps and curb cuts, sidewalk obstructions including cars parked on <br />sidewalks, trail gaps, wide intersections, and poor sidewalk connections to transit stops. <br />·Policy CSF-6.8 - Maintenance. Ensure that sufficient funding is provided for the ongoing <br />maintenance of City-owned facilities, including streets, streetlights, traffic signals, <br />landscaping, street trees, storm drains, public buildings, and other infrastructure. <br />Environmental Review <br />This project is categorically exempt from the California Environmental Quality Act (CEQA) per <br />Section 15301(c) of the CEQA guidelines. The Notice of Exemption was filed with the Alameda <br />County Recorder on September 27, 2019, and the City received no public objections to the <br />project within the statutory comment period. <br />Summary of Public Outreach Efforts <br />This project was advertised in the Daily Review on September 20, 2019, as well as in three other <br />newspapers with circulations that reflect San Leandro’s diversity. Staff also notified contractors <br />interested in working with the City and sent the Contract Book to local builder’s exchanges. <br />Prior to construction, the Contractor notified residents and businesses whose properties were <br />directly impacted by construction of the construction activities. <br />Fiscal Impacts <br />The construction costs are as described below: <br />Design, Site Investigation and Bid $74,280 <br />Construction Contract $1,172,980 <br />Contract Change Order $434,000 <br />Construction Management and Inspection $133,178 <br />Total $1,814,438 <br />Change Order Summary <br />Change Order limit authorized at contract award was 27% ($316,705). <br />CCO No.Description Amount % <br />1 Added scope for removal of street trees.$58,635 5% <br />2 Added scope for removal of street trees. $58,635 5% <br />Page 3 City of San Leandro Printed on 3/16/2022
The URL can be used to link to this page
Your browser does not support the video tag.