My WebLink
|
Help
|
About
|
Sign Out
Home
9C Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2022
>
Packet 03212022
>
9C Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2022 12:13:28 PM
Creation date
4/1/2022 12:13:27 PM
Metadata
Fields
Template:
CM City Clerk-City Council
Retention
PERM
Document Relationships
Reso 2022-045 Spencon Contract Change Order Annual Sidewalk Repair
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
File Number: 22-092 <br />3 Added scope for removal of street trees. $58,620 5% <br />4 Added scope for removal of street trees. $58,650 5% <br />5 Added scope for removal of street trees, $58,620 5% <br />replacement of ADA compliant truncated <br />domes, installation of new bike racks <br />6 Added scope for removal of street trees. $23,535 2% <br /> <br />7 Added scope for additional locations and $58,655 5% <br />removal of street trees. <br />8 Added scope for additional locations and $58,650 5% <br />removal of street trees. <br /> <br />Total Requested Change Orders $434,000 37% <br />Budget Authority <br />This sidewalk repair project is funded as follows: <br />Account No.Appropriation Dates & Source Amount <br />144-36-420 FY 2020-21, Measure B $117,295* <br />144-36-414 FY 2019-20, Measure B $450,000 <br />141-38-414 FY 2019-20, Measure BB $50,000 <br />141-36-414 FY 2019-20, Measure BB $220,000 <br />141-36-006 FY 2019-20, Measure BB $63,194 <br />144-36-006 FY 2019-20, Measure B $89,414 <br />144-36-400 FY 2018-19, Measure B $210,852 <br />141-38-400 FY 2018-19, Measure BB $20,000 <br />141-36-400 FY 2018-19, Measure BB $100,000 <br />150-36-429 FY 2018-19, TDA Grant $67,029 <br />210-36-400 FY 2018-19, General Fund $205,000 <br />144-36-379 FY 2017-18, Measure B $138,954 <br />150-36-428 FY 2017-18, TDA Grant $82,700 <br />Total Proposed Project Funding $1,814,438 <br />*Not the full appropriation; only the portion used on this project/contract is shown. <br />PREPARED BY: Phillip Toste, Associate Engineer, Engineering and Transportation <br />Department <br />Page 4 City of San Leandro Printed on 3/16/2022
The URL can be used to link to this page
Your browser does not support the video tag.