My WebLink
|
Help
|
About
|
Sign Out
Home
9A Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2022
>
Packet 04182022
>
9A Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2022 1:31:29 PM
Creation date
4/18/2022 1:31:14 PM
Metadata
Fields
Template:
CM City Clerk-City Council
Retention
PERM
Document Relationships
Reso 2022-055 CSA Nichols Consulting
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Consulting Services Agreement between City of San Leandro and March 22, 2022 <br />NCE for Annual Street Paving 21-23 Exhibit A – Page 10 of 12 <br />lights and signals. Survey data for sanitary and storm drain facilities will include rim <br />elevations, invert elevations, pipe direction and pipe size will be provided for accessible <br />structures within the mapping limit. To the extent visible, the survey will obtain a <br />measurement from the top of manhole rim to the top of cone, and note any adjustment <br />rings. In no case shall the surveyor enter a manhole to obtain any data. <br />• Location of all surface evident street monumentation within the mapping corridor (for <br />preservation and Record R/W purposes). <br />• Location of underground utility locator markings. <br />• Provide a topographic survey for each area of work. Plans shall be clean and legible, with <br />data points / text information not overlapping other data. <br />• Provide AutoCAD Civil3D DTM surface for each street section. <br />• Any observed water meter or sewer cleanout behind the back of walk (up to 5’ behind <br />walk) will also be surveyed. <br /> <br />Survey shall also include: <br />• Additional detail and elevation data collected at intersections identified for enhanced <br />pedestrian improvements, such as bulbouts or RRFB’s. <br /> <br />Survey to use a combination of record data and any monuments collected during topographic <br />surveying, to locate the existing right-of-way limits. Additionally, the surveyor will calculate and <br />show the location of each adjoining parcel lot line from record data (assessor’s parcel data, record <br />mapping and apparent lines of occupation). It should be noted this property line data will not be <br />based upon a field survey and should be considered approximate only. <br />Subtask - 6.2 Utility Locating <br />Using GPR, Consultant’s utility locator will field locate utility alignments and depths for utility mains <br />and laterals for utilities within all rehabilitation streets in accordance with key assumptions to the <br />extent that GPR methods can detect utilities. Traffic control will consist of a 1-man crew with traffic <br />control arrow board and signs. Utility location markings from the GPR investigation will be included <br />in topographic surveys. <br />If GPR cannot establish utility alignments and or depths, potholing may need to be completed for <br />additional scope and fee. GPR along utility mains will be marked at various locations along each <br />street section. No utility potholing is included in this scope of work. <br />Task 7– Design Support During Bidding <br />Consultant will provide services during bidding of the Paving Rehabilitation and Sanitary Sewer Point <br />Repair projects. This will include attending the pre-bid conferences, responding to bid questions about the <br />project design, and preparation of bid addenda and/or clarifications to the PS&E. <br />Task 8 – Design Support During Construction <br />Consultant will provide support services during construction of the Surface Seal, Rehabilitation and <br />Sanitary Sewer Point Repair projects. At a minimum, these services are anticipated to include attendance <br />at the pre-construction and pre-paving conferences, periodic participation in weekly construction meetings, <br />reviewing Contractor submittals (particularly mix design and materials), responding to Contractor requests <br />for information (RFI), providing recommendations for any necessary construction changes due to
The URL can be used to link to this page
Your browser does not support the video tag.