Laserfiche WebLink
Environmental Checklist <br />Air Quality <br />Environmental Consistency Checklist Pursuant to CEQA Guidelines Section 15183 25 <br />3 Air Quality <br />Significant <br />Impact <br />Less Than <br />Significant or Less <br />than Significant <br />with Mitigation <br />Incorporated <br />No <br />Impact <br />Analyzed <br />in the <br />Prior EIR <br />Substantially <br />Mitigated by <br />Uniformly <br />Applicable <br />Development <br />Policies <br />Would the project: <br />a.Conflict with or obstruct <br />implementation of the <br />applicable air quality plan?□■□■□ <br />b.Result in a cumulatively <br />considerable net increase of <br />any criteria pollutant for <br />which the project region is <br />non-attainment under an <br />applicable federal or state <br />ambient air quality standard?□■□■□ <br />c.Expose sensitive receptors to <br />substantial pollutant <br />concentrations?□■□■□ <br />d.Result in other emissions <br />(such as those leading to <br />odors) adversely affecting a <br />substantial number of people?□■□■□ <br />Analysis in Previous Environmental Document <br />The General Plan EIR discusses air quality impacts on pages 4.2-22 through 4.2-53. Impacts from <br />conflicting with or obstructing implementation of the Clean Air Plan would be less than significant. <br />Impacts from cumulatively considerable net increases of criteria pollutants via construction and <br />operation for which the project region is in nonattainment would be significant even after the <br />incorporation of Mitigation Measure AQ-1, AQ-2A, AQ-2B-1, and AQ-2B-2 reproduced below. <br />Impacts to sensitive receptors from substantial pollutant concentration exposure as well as impacts <br />from odors and other emissions would be less than significant. <br />Mitigation Measure AQ-1 <br />Mitigation Measure AQ-1 would require implementation of Bay Area Air Quality Management <br />District-approved (BAAQMD) mitigation measures if subsequent environmental review determines <br />that applicants for future development in San Leandro could generate operational emissions in <br />excess of the BAAQMD significance thresholds. <br />Mitigation Measure AQ-2A <br />Prior to issuance of construction permits, development project applicants that are subject to CEQA <br />and exceed the screening sizes in the BAAQMD CEQA Guidelines shall prepare and submit to the <br />City of San Leandro a technical assessment evaluating potential air quality impacts related to the