My WebLink
|
Help
|
About
|
Sign Out
Home
11A Public Hearings
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2022
>
Packet 05022022
>
11A Public Hearings
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2022 4:06:05 PM
Creation date
5/10/2022 4:01:51 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
5/2/2022
Retention
PERM
Document Relationships
Ord 2022-005 PP Zoning Map Amendment Second Reading
(Approved by)
Path:
\City Clerk\City Council\Ordinances\2022
Reso 2022-068 PD SPR
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2022
Reso 2022-069 Tentative Map 2824 Halcyon Drive
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
256
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental Checklist <br />Hazards and Hazardous Materials <br />Environmental Consistency Checklist Pursuant to CEQA Guidelines Section 15183 67 <br />g.Expose people or structures, either directly or indirectly, to a significant risk of loss, injury, or <br />death involving wildland fires? <br />As stated in the General Plan EIR, the project site is not within a high fire hazard severity zone. The <br />project site is in an urbanized area, surrounded primarily by paved surfaces and structures and not <br />intermixed with or adjacent to wildlands. Project implementation would therefore not increase <br />exposure to wildland fire hazards. The project would not expose people or structures to a significant <br />risk of loss, injury or death involving wildland fires, and this impact would be less than significant. <br />For further discussion on wildfire impacts, refer to Section 20, Wildfire. <br />Conclusion <br />The project applicant would be required to comply with COA HAZ-1 and COA HAZ-2, as well as <br />survey for the presence of ACM and lead-based paint, and to remediate these hazardous materials, <br />if identified. Applicable General Plan policies and actions described above would be followed during <br />construction activities. Therefore, the project’s impacts related to hazards and hazardous materials <br />would be no greater than those identified in the General Plan EIR, would not result in new specific <br />effects not addressed in the General Plan EIR, and would require no new mitigation measures. <br />Accordingly, no additional review is required.
The URL can be used to link to this page
Your browser does not support the video tag.