My WebLink
|
Help
|
About
|
Sign Out
Home
11A Public Hearings
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2022
>
Packet 05022022
>
11A Public Hearings
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2022 4:06:05 PM
Creation date
5/10/2022 4:01:51 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
5/2/2022
Retention
PERM
Document Relationships
Ord 2022-005 PP Zoning Map Amendment Second Reading
(Approved by)
Path:
\City Clerk\City Council\Ordinances\2022
Reso 2022-068 PD SPR
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2022
Reso 2022-069 Tentative Map 2824 Halcyon Drive
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
256
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of San Leandro <br />2824 Halcyon Drive Residential Project <br /> <br />88 <br />International Airport. While aircraft noise is occasionally audible on the project site, aircraft noise <br />associated with nearby airport activity would not expose people residing or working near the <br />project site to excessive noise levels. Therefore, impacts would be less than significant. <br />Conclusion <br />The General Plan EIR identified significant and unavoidable impacts to substantial permanent <br />increases in ambient noise levels related to transportation. As the project would not double <br />transportation volumes that currently exist along Halcyon Drive, project-specific noise impacts <br />would not be more severe than identified in the General Plan EIR, and the project would not result <br />in new specific effects that were not addressed in the General Plan EIR. Impacts to the project from <br />existing transportation noise sources would be reduced in accordance with General Plan Action EH- <br />7.1.A and General Plan Policies EH-7.3 and EH-7.6. The project would not require new mitigation <br />measures in addition to those required to reduce impacts from construction noise established in the <br />General Plan EIR under Mitigation Measure NOI-4. Accordingly, no additional review is required.
The URL can be used to link to this page
Your browser does not support the video tag.