My WebLink
|
Help
|
About
|
Sign Out
Home
11A Public Hearings
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2022
>
Packet 05022022
>
11A Public Hearings
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2022 4:06:05 PM
Creation date
5/10/2022 4:01:51 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
5/2/2022
Retention
PERM
Document Relationships
Ord 2022-005 PP Zoning Map Amendment Second Reading
(Approved by)
Path:
\City Clerk\City Council\Ordinances\2022
Reso 2022-068 PD SPR
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2022
Reso 2022-069 Tentative Map 2824 Halcyon Drive
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
256
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit B: Conditions of Approval May 2, 2022 <br />PLN21-0005 2824 Halcyon Drive Page 12 of 15 <br />A qualified biologist would conduct a survey for special-status bats during the <br />appropriate time of day to maximize detectability to determine whether bat <br />species are roosting near the work area no less than 7 days and no more <br />than 14 days prior to beginning ground disturbance and/or construction. <br />Survey methodology may include visual surveys of bats (e.g., observation of <br />bats during foraging period), inspection for suitable habitat, bat sign (e.g., <br />guano), or use of ultrasonic detectors (e.g., Anabat). Visual surveys would <br />include trees within 100 feet of project construction activities. Not more than <br />2 weeks prior to building demolition, the project applicant will retain a qualified <br />biologist to survey buildings proposed for demolition for the presence of <br />roosting bats or evidence of bats. If no roosting bats or evidence of bats are <br />found in the structure, demolition may proceed. If the biologist determines or <br />presumes bats are present (if there are site access issues or structural safety <br />concerns), the biologist shall exclude the bats from suitable spaces by <br />installing one-way exclusion devices. After the bats vacate the space, the <br />biologist shall close off the space to prevent recolonization. Building <br />demolition shall only commence after the biologist verifies 7 to 10 days later <br />that the exclusion methods have successfully prevented bats from returning. <br />To avoid impacts on nonvolant (i.e., nonflying) bats, the biologist shall only <br />conduct bat exclusion and eviction from May 1 through October 1. Exclusion <br />efforts shall be restricted during periods of sensitive activity (e.g., during <br />hibernation or while females in maternity colonies are nursing young). <br />74. MM HAZ-1 Soil Management Plan for Impacted Soils. If impacted soils or other <br />impacted wastes are present at the project site, the project applicant will retain a <br />qualified environmental consultant (PG or PE), to prepare a Soil Management <br />Plan (SMP) prior to construction. The SMP, or equivalent document, will be <br />prepared to address onsite handling and management of impacted soils or other <br />impacted wastes, and reduce hazards to construction workers and offsite <br />receptors during construction. The plan must establish remedial measures <br />and/or soil management practices to ensure construction worker safety, the <br />health of future workers and visitors, and the off-site migration of contaminants <br />from the site. These measures and practices may include, but are not limited to: <br />a. Stockpile management including stormwater pollution prevention and the <br />installation of BMPs <br />b. Proper disposal procedures of contaminated materials <br />c. Monitoring and reporting <br />d. A health and safety plan for contractors working at the site that addresses <br />the safety and health hazards of each phase of site construction activities <br />with the requirements and procedures for employee protection <br />e. The health and safety plan will also outline proper soil handling procedures <br />and health and safety requirements to minimize worker and public exposure <br />to hazardous materials during construction. <br />f. The lead agency will review and approve the development site Soil <br />Management Plan for Impacted Soils prior to demolition and grading.
The URL can be used to link to this page
Your browser does not support the video tag.