My WebLink
|
Help
|
About
|
Sign Out
Home
11A Public Hearings
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2022
>
Packet 05022022
>
11A Public Hearings
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2022 4:06:05 PM
Creation date
5/10/2022 4:01:51 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
5/2/2022
Retention
PERM
Document Relationships
Ord 2022-005 PP Zoning Map Amendment Second Reading
(Approved by)
Path:
\City Clerk\City Council\Ordinances\2022
Reso 2022-068 PD SPR
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2022
Reso 2022-069 Tentative Map 2824 Halcyon Drive
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
256
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit B: Conditions of Approval May 2, 2022 <br />PLN21-0005 2824 Halcyon Drive Page 13 of 15 <br />75. MM HAZ-2. Remediation. If soil present within the construction envelope at the <br />project site contains chemicals at concentrations exceeding hazardous waste <br />screening thresholds for contaminants in soil (California Code of Regulations <br />[CCR] Title 22, Section 66261.24), the project applicant will retain a qualified <br />environmental consultant to conduct additional analytical testing and <br />recommend soil disposal recommendations, or consider other remedial <br />engineering controls, as necessary. <br />The qualified environmental consultant will utilize the site analytical results for <br />waste characterization purposes prior to offsite transportation or disposal of <br />potentially impacted soils or other impacted wastes. The qualified environmental <br />consultant will provide disposal recommendations and arrange for proper <br />disposal of the waste soils or other impacted wastes (as necessary), and/or <br />provide recommendations for remedial engineering controls, if appropriate. <br />The City will review and approve the disposal recommendations prior to <br />transportation of waste soils offsite, and review and approve remedial <br />engineering controls, prior to construction. <br />Remediation of impacted soils and/or implementation of remedial engineering <br />controls, may require additional delineation of impacts; additional analytical <br />testing per landfill or recycling facility requirements; soil excavation; and offsite <br />disposal or recycling. <br />The City will review and approve the disposal recommendations prior to <br />transportation of waste soils offsite and review and approve remedial <br />engineering controls, prior to construction. <br />XI. CONSTRUCTION AND MAINTENANCE PROVISIONS <br />76. Construction Hours. Construction on the Project site shall not begin prior to 7:00 <br />am Monday through Friday, and prior to 8:00 am on Saturday and Sunday, and <br />shall cease by 7:00 pm each evening, unless otherwise approved by the Chief <br />Building Official. There shall be no construction on Federal holidays. Interior <br />construction shall be permitted outside the above hours provided that <br />construction noise shall not be detectable outside of the structures being built. <br />77. Construction Activity. Construction activity shall not create dust, noise or safety <br />hazards for adjacent residents and properties. Dirt and mud shall not be tracked <br />onto surrounding streets from the Project site during construction. <br />78. Maintenance. During the construction phase, the site shall be well maintained in <br />a neat manner, free of weeds, litter and debris. <br />79. Secure Construction Site. The property shall be secured during construction with <br />a six (6) foot high chain link fence and any other security measures in <br />accordance with recommendation of the San Leandro Police Department. <br />80. Pest and Vermin Control. Pest and vermin control shall be instituted prior to the <br />demolition and construction of the project. <br />81. Construction Facilities. Potable water and temporary sanitary facilities shall be <br />provided to workers during construction activities. Temporary sanitary facilities
The URL can be used to link to this page
Your browser does not support the video tag.