Laserfiche WebLink
Description Current Fee Reference Proposed Fees Explanation <br />COMMUNITY DEVELOPMENT DEPARTMENT - Building Regulations Division (continued) <br />ix) Signs <br />Sign permit fees are based on all signs being on the same property and on the same permit. <br />a) 1st Non-energized sign attached to building. $117 CPI, 4.2% increase <br />b) each additional sign thereafter: $59 CPI, 4.2% increase <br />c) Pylon sign, energized or not, each: $248 CPI, 4.2% increase <br />d) Monument sign, energized or not, each $185 CPI, 4.2% increase <br />e) Relocation or alteration of any sign electronically or mechanically, but not including <br />replacement of tubing, transformers and such parts subject to failure; or shop inspection by <br />the local inspection department in lieu of a UL label (a local electrical inspection department <br />label of approval shall be required), each <br /> $93 CPI, 4.2% increase <br />x) Demolition <br />a) Commercial/Residential Demolition up to 3,000SF $315 CPI, 4.2% increase <br />b) Each Additional 10,000SF $209 CPI, 4.2% increase <br />xi) Addressing Fee $131 $136 CPI, 4.2% increase <br />C. Plan Checking Fee <br />Plan checking fee shall be paid at the time of application for a building permit. The plan checking fee is in <br />addition to the building permit fee and shall be as follows: <br />i) Plan Check Fee, if applicable 80% of building permit fee 80% of building permit fee <br />ii) For Master Plans (i.e. identical buildings built by the same builder on the same lot or in the same <br />tract and for which building permits are issued at the same time) <br />A full plan checking fee shall be paid for each Master Plan <br />when more than one building will be built and one-third (33%) <br />of the full plan checking fee shall be paid for each production <br />phase building at time of application. <br />A full plan checking fee shall be paid for each Master Plan when more than one <br />building will be built and one-third (33%) of the full plan checking fee shall be paid <br />for each production phase building at time of application. <br />iii) Changes, revisions, or additions to plans previously checked $201 per hour; 1 hour minimum charge $209 per hour; 1 hour minimum charge CPI, 4.2% increase <br />iv) Additional plan review after the first re-check $201 per hour; 1 hour minimum charge $209 per hour; 1 hour minimum charge CPI, 4.2% increase <br />v) Alternate Methods and Materials $201 per hour; 1 hour minimum charge $209 per hour; 1 hour minimum charge CPI, 4.2% increase <br /> <br />vi) Energy Conservation - for all buildings and projects subject to the California Energy Commission’s <br />conservation regulations <br />20% of building permit fee 20% of building permit fee <br />D. Miscellaneous Fees <br />i) Miscellaneous Inspections <br />a) Fees for inspection not otherwise set forth herein $209 per hour; 1 hour minimum charge CPI, 4.2% increase <br />b) Fees for inspection conducted outside of normal business hours $315 hourly rate; 2 hour minimum charge CPI, 4.2% increase <br />$113 <br />$89 <br />$302 <br />$201 <br />$201 per hour; 1 hour minimum charge <br />$302 hourly rate; 2 hour minimum charge <br />$178 <br />$57 <br />$238 <br />4