BID SUMMARY
<br />
<br />Phase 1
<br />BID OPENING Azul Works, Inc.Bay Cities Paving & Grading, Inc.DeSilva Gates Construction, LLC
<br />DATE: April 14, 2022 1400 Egbert Avenue 1450 Civic Ct., Bldg. B - #400 11555 Dublin Boulevard
<br />TIME: 3:00 pm San Francisco, CA 94124 Concord, CA 94520 Dublin, CA 94568
<br />LOCATION: City Clerk's Office Phone: (415) 558-1507 Phone: (925) 687-6666 Phone: (925) 829-9220
<br />Fax: (415) 558-1556 Fax: (925) 687-2122 Fax: (925) 803-4263
<br />ITEM
<br />NO.ITEM UNIT COST ITEM COST UNIT COST UNIT COST UNIT COST
<br />Prepared by: N. Castelino
<br />Date Approved: 3/9/2022
<br />ENGINEER'S ESTIMATE
<br />ITEM COST
<br />PROJECT TITLE:
<br />PROJECT NO.:
<br />BID NO.:
<br />QUANTITY
<br />Annual Street Overlay/Rehabilitation 19-21
<br />2020.0050
<br />21-22.009
<br />This document is a summary of bids received for the subject project and are
<br />provided only as a convenience. Listing of a particular bid is not a finding that
<br />such bid has been found to be responsive or accepted as complete by the City.
<br />An award of contract, if any, is subject to approval of the City Council and/or the
<br />City Manager. Contractors should refer to the contract documents for bidding
<br />information.
<br />ITEM COSTITEM COST
<br />23 Remove and Replace Concrete
<br />Curb and Gutter per Section 303-
<br />5
<br />2,470 LF $ 75.00 $185,250.00 $64.00 $158,080.00 $112.00 $276,640.00 $115.00 $284,050.00
<br />24 Remove and Replace Concrete
<br />Rolled Curb and Gutter per
<br />Section 303-5
<br />81 LF $ 85.00 $6,885.00 $72.00 $5,832.00 $120.00 $9,720.00 $125.00 $10,125.00
<br />25 Remove and Replace Concrete
<br />Valley Gutter per Section 303-5 1,175 SF $ 35.00 $41,125.00 $38.00 $44,650.00 $65.00 $76,375.00 $70.00 $82,250.00
<br />26 Remove and Replace Concrete
<br />Curb Ramp per Section 303-5 8,783 SF $ 40.00 $351,320.00 $26.00 $228,358.00 $36.00 $316,188.00 $40.00 $351,320.00
<br />27 Remove and Replace Concrete
<br />Sidewalk per Section 303-5 4,277 SF $ 27.00 $115,479.00 $14.00 $59,878.00 $20.00 $85,540.00 $22.00 $94,094.00
<br />28 Relocate Private Improvements at
<br />Curb Ramp per Section 303-5 1 LS $ 5,000.00 $5,000.00 $3,000.00 $3,000.00 $4,500.00 $4,500.00 $4,500.00 $4,500.00
<br />29 Full Depth Base Repair (6 Inches)
<br />per Section 302-3 776 TON $ 200.00 $155,200.00 $200.00 $155,200.00 $202.00 $156,752.00 $210.00 $162,960.00
<br />30 Cold Milling Asphalt Pavement (2-
<br />Inch Depth) per Section 302-1 2,150 SY $ 5.50 $11,825.00 $10.00 $21,500.00 $15.85 $34,077.50 $7.00 $15,050.00
<br />31 Cold Milling Asphalt Pavement
<br />(2.5-Inch Depth) per Section 302-
<br />1 19,641 SY $ 6.00 $117,846.00 $3.60 $70,707.60 $5.60 $109,989.60 $8.00 $157,128.00
<br />32 ADA Profile Mill Asphalt
<br />Pavement per Section 302-1.4 281 SY $ 10.00 $2,810.00 $6.60 $1,854.60 $47.00 $13,207.00 $45.00 $12,645.00
<br />33 Cold In-Place Recycling (3.5-Inch
<br />Depth) per Section 302-15 10,341 SY $ 14.00 $144,774.00 $15.00 $155,115.00 $16.75 $173,211.75 $18.00 $186,138.00
<br />34 Remove Surfacing and Base per
<br />Setion 302-1 2,791 CY 100.00$ $279,100.00 $50.00 $139,550.00 $122.85 $342,874.35 $90.00 $251,190.00
<br />Bid Summary - Annual Street Overlay Rehabilitation 19-21 Phase 1.xlsx Page 3 of 6 Printed 4/15/2022 @ 1:07 PM
|