Laserfiche WebLink
SAN LEANDRO SHORELINE DEVELOPMENT EIR ADDENDUM PROJECT <br />CITY OF SAN LEANDRO <br /> <br />May 2022 Page 57 <br />4.17 TRANSPORTATION <br />4.17.1 IMPACTS ASSOCIATED WITH THE MODIFIED PROJECT <br />Would the project: <br />Environmental Issues <br />Substantial <br />Change in <br />Project <br />Requiring <br />Major <br />EIR/MND <br />Revisions <br />Substantial <br />Change in <br />Circumstanc <br />es Requiring <br />Major <br />EIR/MND <br />Revisions <br />New <br />Information <br />Showing <br />New or <br />Increased <br />Significant <br />Effects <br />Less Than <br />Significant <br />Impacts/No <br />Changes or <br />New <br />Information <br />Requiring <br />Preparation <br />of a <br />Subsequent <br />EIR/MND No Impact <br />a) Conflict with a program, plan, <br />ordinance, or policy addressing the <br />circulation system, including transit, <br />roadway, bicycle and pedestrian facilities? <br /> x <br />b) Would the project conflict or be <br />inconsistent with CEQA Guidelines section <br />15064.3, subdivision (b)? <br /> x <br />c) Substantially increase hazards due <br />to a geometric design feature (e.g., sharp <br />curves or dangerous intersections) or <br />incompatible uses (e.g., farm equipment)? <br /> x <br />d) Result in inadequate emergency <br />access? x <br /> <br />Background: <br />2022 Appendix G Threshold <br />The CEQA Checklist Guidelines for Transportation has been updated since those used for the Certified EIR <br />of the Original Project. The changes are detailed below: <br /> <br />XVII. TRANSPORTATION/TRAFFIC. <br />Would the project: <br />a) Conflict with an applicable program plan, ordinance or policy establishing measures of <br />effectiveness for the performance of addressing the circulation system, including transit, <br />roadway, bicycle and pedestrian facilities? taking into account all modes of transportation <br />including mass transit and non-motorized travel and relevant components of the circulation <br />system, including but not limited to intersections, streets, highways and freeways, pedestrian and <br />bicycle paths, and mass transit? <br />b) Would the project conflict or be inconsistent with CEQA Guidelines section 15064.3, subdivision <br />(b)(1)? Conflict with an applicable congestion management program, including, but not limited to