My WebLink
|
Help
|
About
|
Sign Out
Home
11B Public Hearings
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2022
>
Packet 06212022
>
11B Public Hearings
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2022 1:20:53 PM
Creation date
6/28/2022 1:00:14 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
6/21/2022
Retention
PERM
Document Relationships
Reso 2022-085 Approving Third Addendum and Planning Entitlements
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2022
Reso 2022-086 2nd amendment to DDA
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
502
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN LEANDRO SHORELINE DEVELOPMENT EIR ADDENDUM PROJECT <br />CITY OF SAN LEANDRO <br /> <br />Page 60 PlaceWorks <br />TRAF-d. <br />The Certified EIR found that the Original Project concept design is required to comply with all City <br />roadway and access standards as well as other requirements in the California Fire Code and California <br />Vehicle Code. As with the Original Project, the Modified Project is well-served by public streets and access <br />to the project site from Fairway Drive and Monarch Bay Drive remains the same. Therefore, due to the <br />same roadway access and based on the concept plan, the Modified Project would not result in a new <br />impact or a substantial increase in magnitude of the existing impacts as they relate to emergency access.
The URL can be used to link to this page
Your browser does not support the video tag.