My WebLink
|
Help
|
About
|
Sign Out
Home
MO 2002-055 to 2002-060
CityHall
>
City Clerk
>
City Council
>
Minute Orders
>
2002
>
MO 2002-055 to 2002-060
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2022 12:14:38 PM
Creation date
7/12/2022 11:51:53 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Minute Order
Document Date (6)
12/31/2002
Retention
PERM
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
292
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSAL <br />Rezoning <br />The proposal includes a rezone from IG Industrial General to IG-PD Industrial General, Planned <br />Development Overlay District. The Planned Development is proposed in order to limit the types <br />of industrial uses that would be allowed in the new industrial business park and, also, to limit the <br />amount of non -ancillary office square footage that will be permitted.. The purpose is to prevent <br />less desirable industrial uses that may cause significant land use conflicts or traffic impacts. The <br />adjacent land uses in the area are IG Industrial General. Other zoning designations in the <br />immediate project vicinity include IP Industrial Park, PS Public (the City's Water Pollution <br />Control Plant), and CR Commercial Recreation (Oyster Bay Regional Shoreline). <br />Tentative Map <br />A tentative map (Tentative Tract Map 7382) is included with this proposal. All existing facilities <br />will be underground and will be maintained by the respective agencies. The map shows the <br />property line boundaries, various easements, and infrastructure serving the proposed <br />development. The easements include public utility, storm drain (including proposed bioswales), <br />emergency vehicle access, water/wastewater, and access for the new private road. The map <br />conforms to the proposed Site Plan described below. <br />Site Plan <br />The proposal is to construct eight (8) industrial buildings, of which seven (7) would be <br />speculative and would range in size from 17,550 square feet (this represents an increase of 1,950 <br />square feet over that previously proposed) to 58,700 square feet. The eighth building, a proposed <br />FedEx Ground building, would be located at the rear (south) of the business park and is proposed <br />for 66,500 square feet. The buildings are proposed to occupy their own parcels (the ninth parcel <br />would be comprised of the private access road and the wetland mitigation area) and have been <br />designed to meet underlying IG zoning district requirements for landscaping, building height, lot <br />coverage, floor area ratio (FAR), and parking. There would be a slight deviation to building <br />setback requirements for Lots B, C, E, and G, which would be permissible with approval of the <br />Planned Development. <br />Access to the business park would be from Davis Street, via a new private road, which would <br />terminate at the FedEx Ground Facility. The road is proposed along the western project boundary <br />and would provide secondary access to Waste Management (an existing situation). Parcel A <br />would be the only parcel with direct access onto Davis Street. <br />Elevations, Landscaping, Signage <br />Please refer to the discussion included in the July 30, 2002 Planning Commission staff report <br />(attached). <br />PLN2002-00031 — Bayside Business Park October 10, 2002 <br />Planning Commission Page 3 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.