Laserfiche WebLink
PROPOSAL <br />Rezoning <br />The proposal includes a rezone from IG Industrial General to IG-PD Industrial General, Planned <br />Development Overlay District. The Planned Development is proposed in order to limit the types <br />of industrial uses that would be allowed in the new industrial business park and, also, to limit the <br />amount of non -ancillary office square footage that will be permitted.. The purpose is to prevent <br />less desirable industrial uses that may cause significant land use conflicts or traffic impacts. The <br />adjacent land uses in the area are IG Industrial General. Other zoning designations in the <br />immediate project vicinity include IP Industrial Park, PS Public (the City's Water Pollution <br />Control Plant), and CR Commercial Recreation (Oyster Bay Regional Shoreline). <br />Tentative Map <br />A tentative map (Tentative Tract Map 7382) is included with this proposal. All existing facilities <br />will be underground and will be maintained by the respective agencies. The map shows the <br />property line boundaries, various easements, and infrastructure serving the proposed <br />development. The easements include public utility, storm drain (including proposed bioswales), <br />emergency vehicle access, water/wastewater, and access for the new private road. The map <br />conforms to the proposed Site Plan described below. <br />Site Plan <br />The proposal is to construct eight (8) industrial buildings, of which seven (7) would be <br />speculative and would range in size from 17,550 square feet (this represents an increase of 1,950 <br />square feet over that previously proposed) to 58,700 square feet. The eighth building, a proposed <br />FedEx Ground building, would be located at the rear (south) of the business park and is proposed <br />for 66,500 square feet. The buildings are proposed to occupy their own parcels (the ninth parcel <br />would be comprised of the private access road and the wetland mitigation area) and have been <br />designed to meet underlying IG zoning district requirements for landscaping, building height, lot <br />coverage, floor area ratio (FAR), and parking. There would be a slight deviation to building <br />setback requirements for Lots B, C, E, and G, which would be permissible with approval of the <br />Planned Development. <br />Access to the business park would be from Davis Street, via a new private road, which would <br />terminate at the FedEx Ground Facility. The road is proposed along the western project boundary <br />and would provide secondary access to Waste Management (an existing situation). Parcel A <br />would be the only parcel with direct access onto Davis Street. <br />Elevations, Landscaping, Signage <br />Please refer to the discussion included in the July 30, 2002 Planning Commission staff report <br />(attached). <br />PLN2002-00031 — Bayside Business Park October 10, 2002 <br />Planning Commission Page 3 of 7 <br />