Laserfiche WebLink
2180 Merced Street 3 02/10/98 <br />A-97-1 1/PD-97-9 <br />Comments Raised at the Planning Commission Meeting <br />The applicant requested an extension to the hours of operation for the convenience store from the 6 <br />a.m. to 10 p.m. as recommended by Staff, to 5 a.m. to 12 a.m. midnight, and that construction work <br />be permitted on Saturdays and Sundays. This would allow the construction to be completed in a <br />timely manner if rain delays any of the work during the weekdays. <br />The Planning Commission recommended the granting of the extended operating hours and <br />permission to perform construction work on Saturdays and interior construction work only, on <br />Sundays. This is based on the adjacent land use having no residences, and being primarily <br />commercial and industrial usage. In addition, the Commission expressed its concern with <br />pedestrians from the on -site parking spaces to the drive-thru circulation at the rear of the building <br />and recommended the applicant direct the pedestrians to walk around the east side of the building <br />using such methods as ground markings and/or directional signs. Moreover, for the purpose of <br />clarification, the Commission also amended the recommended conditions by requiring no less than <br />two employees in the convenience store during the hours of 5 a.m. and 12 a.m. midnight. The <br />Planning Commission also corrected condition number IX. General Condition G, to read "...the <br />Development Services Director can waive compliance with the terms of the application if they are <br />minor in content." <br />Since the Planning Commission meeting, the architect has developed a revised site plan as <br />recommended by the Transportation Administrator. The driveways closest to the corner radius will <br />be redesigned to include raised ground markers and signage to restrict standard vehicles from using <br />them (See Exhibit A - Site Plan, Revised). This design solution was developed by the applicant <br />and by Staff to discourage standard vehicles from crossing multiple lanes for ingress and egress, <br />while allowing large vehicles, such as the tractor trailers, a reasonable means of access to the site <br />for fueling. <br />DISCUSSION <br />The rezoning of the site from IG to IG (PD) will subject any proposal on the property to the City's <br />discretionary review process. This will ensure that any new use or development will be compatible <br />with the existing general area and allow flexibility in deviating from the Zoning Code requirements. <br />The planned development would complement the recent efforts of the other Marina Boulevard <br />property owners to upgrade the appearance and services on Marina Boulevard (i.e., Lucky's, Dairy <br />Belle). Two new services will be provided at this unique and diverse intersection, which already <br />contains commercial type uses such as the Reynolds and Brown office park with a Wells Fargo <br />Bank, Bank of America and Kentucky Fried Chicken. <br />The property was originally developed to accommodate auto repair along with the sale of gasoline. <br />Without the auto repair taking place on the site, its appearance has become that of an underutilized <br />and unproductive property. The proposal should transform the site into an improved and <br />productive use. The stark and unused roll -up doors to the workbays will be treated with a modern <br />storefront design including windows and glass doors; the dumpster will be enclosed and screened <br />from view; the exterior colors and materials will be coordinated; and the unused work area in the <br />e� <br />