Laserfiche WebLink
FY 1997-98 CIP LISTING �'` PAGE 1 <br />O <br />P <br />8-2 Toyon Park Restroom Construction <br />This project includes construction of a replacement of the existing public restrooms at Toyon Park. <br />Bud<uet Estimate: $187,000 FY 199 7-98 <br />FP 12C Casa Peralta Interior Repairs and Painting <br />Repair and painting of interior water damaged walls, floors, ceilings <br />and window frames. <br />Budget Estimate: $90,000 <br />Budget: $30,000 FY 1997-98 <br />P 19 Swimming Pools Computerization <br />Project provides installation of a NOVAR monitoring control system at all three City -owned pools, i.e. <br />Farrelly, Washington Manor, and Boy's and Girl's Club pools. <br />Budget Estimate: $48,000 FY 1997-98 <br />FP 18 Marina Park Small Boat Lagoon Bank Erosion Repair <br />This project will design and construct the needed bank repairs to halt <br />erosion in the Marina Park Small Boat Lagoon. <br />Budget Estimate: $375,000 <br />Budget: $125,000 FY 1997-98 <br />Z Painting City Buildings <br />Annual budar <br />get for painting of City Buildings <br />Garage (interior/exterior - $27,800) <br />Budget Estimate: $50,000 <br />Budget: $77,800 <br />Halcyon Recreation Building (exterior - S50,000), City <br />Annually <br />FY 199 7-98 <br />FB 11 Fire/Fuel Tank Removal and Above Ground Tanks <br />Install above ground fuel tanks at various fire stations for emergency fuel supply for standby generators <br />and apparatus. <br />Budget Estimate: S90,000 <br />Budget: $35,000 (Davis - Station '10) FY 1997-98 <br />NE 2 Annual Boulevard Street Tree Planting <br />Installation of street trees 40' on center on East 14th Street between Blossom and Elsie in 1996-97. <br />Budget Estimate: $105,000 Annually <br />Budget: $105,000 FY 1996-97 <br />Budget: $105,000 FY 1997-98 <br />NE 4 San Leandro Boulevard Entryway Landscaping - North End <br />(Coordinate with N-E-26.) Install new landscaping on the west side of San Leandro Boulevard from <br />the underpass at the Oakland border to developed property near the San Leandro Electric Company. <br />Improvements to include trees, shrubs, and special sidewalk. <br />Budget Estimate: $225,000 <br />Budget: $ 50,000 (Schematic & Design) FY 199 7-98 <br />4 ,i <br />