My WebLink
|
Help
|
About
|
Sign Out
Home
MO 1997-016 to 1997-020
CityHall
>
City Clerk
>
City Council
>
Minute Orders
>
1997
>
MO 1997-016 to 1997-020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2022 4:45:01 PM
Creation date
7/12/2022 4:42:06 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Minute Order
Document Date (6)
12/31/1997
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. FY 1997-98 CIP LISTING <br />PAGE 2 <br />NE 1 i Farnsworth/Nlanor Intersection Landscaping <br />Within the commercial hub at Farnsworth Avenue and Manor Boulevard construct improvements, <br />decorative hardscape, and greenery for revitalization. <br />Budget Estimate: $240,000 <br />Bud;;et: $155,000 FY 1996-97 <br />Budget: $ 85,000 FY 1997-98 <br />NE 21 City-wide Entryway Signs <br />Annual allocation of funds for the installation of monuments at various City entries such as East 14th <br />Street at Bayfair and Davis Street at I-880. <br />Budget Estimate: $200,000 <br />Budget: $50,000 FY 1996-97 <br />Budget: $55,000 FY 1997-98 <br />NE 22 Arterial Banner Supplement <br />Install banners along arterial streets similar to those displaved along East 14th Street. <br />Budget Estimate: $200,000 <br />Budget: $50,000 FY 1996-97 <br />Budget: $50,000 FY 1997-98 <br />NE 23 City-wide Neighborhood Entry Signs <br />/24 Continued program installation of entry monuments in two neighborhoods. <br />Budget Estimate: $60,000 <br />Budget: $15,000 FY 1996-97 <br />Budget: $16,000 FY 1997-98 <br />NE 25 Fairway Drive Median Landscaping and Boulevard Street Trees <br />Installation of street trees and irrigation on both shoulders and on the median on Fairway from Neptune <br />to Aurora and installation of median island landscaping and irrigation system on Fairway Drive from <br />Aurora to Doolittle. <br />Budget Estimate: S255,000 <br />Budget: $150,000 FY 1996-97 <br />Budget: $105,000 FY 1997-98 <br />NE 27 San Leandro Boulevard/Davis Street BART Landscaping Improvements <br />Design and construction of landscaping improvements along the street frontage of the BART station <br />adjacent to San Leandro Boulevard and Davis Street. <br />Budget Estimate: $100,000 <br />Budget: $20,000 FY 1997-98 <br />NE 28 Bus Shelter Installation <br />Construction of bus shelters at various high patron volume locations. Three to be done are: City Hall, <br />EB Estudillo F/S East 14th Street, and NB Washington F/S Springlake. <br />Budget Estimate: $30,000 Annually <br />3B Estudillo/Callan Garage Stairwell Remodel <br />Design and construction of Estudillo/Callan garage stairwell and security improvements. <br />Budget Estimate: $50,000 V FY 1997-98 <br />46 <br />
The URL can be used to link to this page
Your browser does not support the video tag.