Laserfiche WebLink
. FY 1997-98 CIP LISTING <br />PAGE 2 <br />NE 1 i Farnsworth/Nlanor Intersection Landscaping <br />Within the commercial hub at Farnsworth Avenue and Manor Boulevard construct improvements, <br />decorative hardscape, and greenery for revitalization. <br />Budget Estimate: $240,000 <br />Bud;;et: $155,000 FY 1996-97 <br />Budget: $ 85,000 FY 1997-98 <br />NE 21 City-wide Entryway Signs <br />Annual allocation of funds for the installation of monuments at various City entries such as East 14th <br />Street at Bayfair and Davis Street at I-880. <br />Budget Estimate: $200,000 <br />Budget: $50,000 FY 1996-97 <br />Budget: $55,000 FY 1997-98 <br />NE 22 Arterial Banner Supplement <br />Install banners along arterial streets similar to those displaved along East 14th Street. <br />Budget Estimate: $200,000 <br />Budget: $50,000 FY 1996-97 <br />Budget: $50,000 FY 1997-98 <br />NE 23 City-wide Neighborhood Entry Signs <br />/24 Continued program installation of entry monuments in two neighborhoods. <br />Budget Estimate: $60,000 <br />Budget: $15,000 FY 1996-97 <br />Budget: $16,000 FY 1997-98 <br />NE 25 Fairway Drive Median Landscaping and Boulevard Street Trees <br />Installation of street trees and irrigation on both shoulders and on the median on Fairway from Neptune <br />to Aurora and installation of median island landscaping and irrigation system on Fairway Drive from <br />Aurora to Doolittle. <br />Budget Estimate: S255,000 <br />Budget: $150,000 FY 1996-97 <br />Budget: $105,000 FY 1997-98 <br />NE 27 San Leandro Boulevard/Davis Street BART Landscaping Improvements <br />Design and construction of landscaping improvements along the street frontage of the BART station <br />adjacent to San Leandro Boulevard and Davis Street. <br />Budget Estimate: $100,000 <br />Budget: $20,000 FY 1997-98 <br />NE 28 Bus Shelter Installation <br />Construction of bus shelters at various high patron volume locations. Three to be done are: City Hall, <br />EB Estudillo F/S East 14th Street, and NB Washington F/S Springlake. <br />Budget Estimate: $30,000 Annually <br />3B Estudillo/Callan Garage Stairwell Remodel <br />Design and construction of Estudillo/Callan garage stairwell and security improvements. <br />Budget Estimate: $50,000 V FY 1997-98 <br />46 <br />