Laserfiche WebLink
10/14/97 19:38 <br />V510 278 6547 <br />EBDA <br />444 BOB ROCKETT 0 004/020 <br />1 authorizes an <br />additional 20.2 MGD <br />of interruptible <br />capacity, in addition to the firm <br />2 capacity of 19.72 MGD and interruptible capacity of 1.28 MGD provided in the existing <br />3 agreements. <br />4 1.2 "Interruptible flow basis" means that all LAVWMA instantaneous flow rates <br />5 exceeding 19.72 MGD are restricted to the difference between the EBDA pipeline's <br />6 maximum capacity of approximately 189.1 MGD and the actual total combined <br />7 instantaneous flow from all EBDA member agencies plus LAVWMA's firm capacity of <br />8 19.72 MGD of instantaneous rate of flow. This additional flow is the interruptible capacity. <br />9 The interruptible capacity is variable and dynamic as the actual flow rates change <br />10 continuously throughout any given hour, day and season. As an example, for the total <br />11 system capacity of 189.1 MGD, when the combined EBDA member agency instantaneous <br />12 flow reaches 169.4 MGD, all L.AI( 'hnstantaneous flow beyond 19,72 MGD shall be <br />13 interrupted. <br />14 1.3 The parties shall cooperate in developing a separate operating procedure <br />15 that fully describes operation, responsibilities, and communication procedures during wet <br />16 weather flow conditions such that both systems are protected and that spills and/or <br />17 overflows are prevented_ Said operating procedure shall not in any way modify the terms <br />18 and conditions set forth in this Agreement. <br />19 �4 Th�s'.'?gr beta.^:t� entire t�ntc mct >f?.,paties <br />p.. .. 4. .:. ... <br />'A"20'� <br />2106 <br />^sw: .(%ri <br />✓' 1 .•�, tp] �(. <br />22 _.._ ! < ;10101 <br />!............. ' <br />TOM �5' <br />23 <br />rat 3 rev. o per Joint mtng, mte, Haywardan 3 cto er 1 997 <br />- 21.3 <br />