Laserfiche WebLink
City of San Leandro - Parking Enforcement <br />Scope of Work - LAZ Parking <br />28 <br /> <br />Liquidated Damages <br />The following are the proposed liquidated damages that would be incorporated into the <br />Contractor’s agreement if this service option is considered: <br /> <br />Adhering to Collection Schedule, Collection Services & Counting Services <br />If the Contractor fails to meet its collection schedule obligations, provide the collection and <br />counting services as mutually established in the Scope of Work, the City will issue a written <br />warning. If such an incident occurs again, the Contractor will be assessed liquidated damage of <br />$500. Should a similar violation occur again during the contract term, the Contractor will be <br />assessed liquidated damages without the benefit of warning in the amount of $500 per <br />incident. <br /> <br />Reporting <br />If the Contractor fails to submit any reports identified in the Scope of Work, the City will issue a <br />written warning. If the Contractor fails to remedy the issue within 1 business day from receiving <br />the written warning, the Contractor will be assessed liquidated damages of $50 per day for <br />each day that the report is overdue from the date of the warning. <br /> <br />Broken Locks <br />If the Contractor is responsible for breaking a meter lock, the Contractor will pay for the <br />replacement and installation of the broken equipment. <br /> <br />Open Meter Doors <br />If a meter door is left unsecured as a result of the Contractor Collection Services, the Contractor <br />will issue a written warning. If such an incident occurs again, the Contractor will be assessed <br />liquidated damage of $100 per incident for each occurrence if there is no loss. If a meter can is <br />missing, the assessment shall be an additional $100 per incident, plus the cost to replace the <br />missing equipment. <br /> <br />Equipment <br />The Contractor will be responsible for the safekeeping of assigned City equipment which will be <br />returned to the City in good condition at the termination of the contract. The Contractor will be <br />responsible and pay for the replacement of any lost or damaged equipment, including <br />collection carts, collection canisters, meter keys, and cash/coin boxes. <br /> <br />