Laserfiche WebLink
City of San Leandro - Parking Enforcement <br />Scope of Work - LAZ Parking <br />27 <br /> <br /> <br />All figures in this SOP are based on average daily transactions. The actual number of PMs per <br />day will be determined by system utilization and alarm notifications from the MS. LAZ will <br />continue to monitor machines on a system-wide basis to continually improve its preventative <br />maintenance process. <br /> <br />Over time, LAZ Management may modify the PM schedule methodology, for example <br />considering historic machine maintenance. <br /> <br />SINGLE SPACE PREVENTATIVE MAINTENANCE PLAN <br />During regular operations (e.g. non-emergency), Preventative Maintenance (“PM”) is <br />conducted on single space parking meters on a weekly basis. Maintenance technicians conduct <br />PMs on a set schedule, with a methodology based on ensuring each meter receives a minimum <br />number of PMs on an annual basis. This schedule may change year by year as metering devices <br />age and historic data is further compiled. <br />