My WebLink
|
Help
|
About
|
Sign Out
Home
MO 1996-022 to 1996-030 (1996-021 missing)
CityHall
>
City Clerk
>
City Council
>
Minute Orders
>
1996
>
MO 1996-022 to 1996-030 (1996-021 missing)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2022 11:19:19 AM
Creation date
7/14/2022 11:17:42 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Minute Order
Document Date (6)
12/31/1996
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' % Casa Peralta <br />-3- <br />June 17, 1996 <br />The current Casa Peralta facilities does not meet accessibility requirements as mandated by <br />ADA and Title 24. The second phase of the project consists of upgrading the Tower to <br />provide a bathroom and kitchen facilities meeting those requirements. This work includes <br />exterior ramping, widening of doors, remodeling of the bathroom fixtures, work surfaces, <br />sinks, and work surfaces in the kitchen area. <br />The pre -design budget presented to Council for this work was $54,444. Adding the above <br />mentioned storage building removal and contingencies for additional dry rot repair the total <br />cost of this phase of work of construction is now estimated at $80,000. <br />Fiscal Impact <br />Original Contract - Perimeter Wall $163,210 <br />Additional work - Perimeter Wall $ 387939 <br />Original Contract - Main House and Tower $ 75,422 <br />Additional work - Main House and Tower $ 38,500 <br />Kitchen/ADA Bathroom 80,000 <br />including storage building demolition <br />Construction costs to complete $396,071 <br />Consultant, administration and inspection 96 000 <br />TOTAL PROJECT COST $4927071 <br />Current funds available $376,250 <br />ADDITIONAL FUNDING REQUIRED $115,821 <br />Funds are available from Community Development Block Grant for Americans with <br />Disability Act Improvements ($35,000) and Capital Improvement contingency reserves <br />($80,821) for the remaining kitchen and seismic work. <br />WKA:RJR:kcj:mc <br />FACOUNCIL\0617\CASACOST.MEM <br />21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.