Laserfiche WebLink
24 days after <br />start <br />29 days after <br />10% submittal <br />28 days after <br />50% submittal returned <br />14 days after <br />90% submittal returned <br />28 days after <br />90% submittal returned <br />10% Submittal - Finalize Retrofit <br />Selection and demand/capacity <br />calculations <br />50% Submittal - Plans, Outline <br />Specification <br />90% Submittal - Plans, Specifications, <br />Permit Submittal <br />Quantity and Cost Estimate <br />100% Construction Documents <br />PHASE 4. CONSTRUCTION ADMINISTRATION AND SUPPORT <br />1. Technical Services as follows: <br />a. Consultation - The Contractor shall make visits to the <br />project sites to review work for conformance to the contract <br />documents; issue written surveillance reports to the City; <br />provide additional drawings for items needing clarification <br />as required; and provide assistance in the interpretation of <br />contract documents and preparation of contract change <br />orders. <br />b. Shop Drawings - The Contractor shall review shop drawings <br />and submittals for approval and conformance to the <br />construction documents. Contractor shall stamp each <br />submittal, indicating their approval or rejection. <br />C. Final Inspection - The Contractor shall prepare a punch list <br />of items requiring repair or replacement (deficiency report) <br />prior to final inspection and participate in a final <br />inspection once notified by the construction contractor that <br />the punch list items have been rectified. <br />d. Record Drawings - The contractor shall prepare record <br />drawings based on contractor's mark-ups. <br />Exhibit A <br />Page 6 of 6 <br />9/26/88 Rev. <br />1/10/90 Rev. <br />