My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 1997-051 to 055
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
1997
>
Reso 1997-051 to 055
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2022 3:59:14 PM
Creation date
7/14/2022 3:49:47 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
12/31/1997
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Plan Check comments from the City shall be incorporated into the Project Manual and <br />Drawings as necessary to obtain a building permit. <br />4. Review comments from the City shall be incorporated into the Project Manual and <br />Drawings prior to submission for bid. <br />A fixed limit of construction cost shall be established by the Design Development Phase <br />cost estimate prepared by the City. In the event that the fixed limit of construction cost <br />is exceeded by more than ten percent (10%) by the Construction Document Phase cost <br />estimate prepared by the City the City shall: <br />a. give written approval of an increase in such fixed limits; or <br />b. cooperate in revising the Project scope and quality as required to reduce the <br />Construction Documents Phase cost estimate. <br />If the City chooses to proceed based on the item (b) the Contractor, without additional <br />charge, shall modify the contract documents as necessary to result in a Construction <br />Documents Phase cost estimate which is not greater than the fixed limit of construction <br />cost plus ten percent (10%). The modification of Contract Documents shall be the limit <br />of the Contractor's responsibility arising out of the establishment of a fixed limit. <br />PHASE THREE <br />BIDDING: <br />Scope of Basic Services <br />The services provided during this phase shall generally be intended to assist the City construction <br />manager obtain bids for the Project. The services to be provided shall include the following: <br />Research, prepare and distribute addenda during the Bidding phase, including the <br />preparation of supplementary drawings, specifications, instructions and notices, as may be <br />necessary to inform bidders of changes in the bidding schedules and procedures and <br />changes or clarification of the specifications and drawings. <br />A. Corrections and clarifications of the Contract Documents and research and <br />preparation of supplementary drawings, specifications, instructions and notices <br />related to addenda caused to be distributed by the Contractor shall be provided <br />as a basic service and no additional compensation shall be paid to the Contractor <br />on account of providing the services. <br />B. Research and preparation of supplementary drawings, specifications, instructions <br />and notices related to addenda caused to be distributed by the City shall be <br />provided as an extra or additional service and additional compensation shall be <br />paid to the Contractor on account of the Contractor providing the service. <br />2. Attend the pre -bid conference(s). <br />Page 7 of 10 <br />Exhibit A <br />05/01/97 <br />
The URL can be used to link to this page
Your browser does not support the video tag.