Laserfiche WebLink
3. Respond to questions from bidders or proposers and clarify or interpret the bidding <br />documents. <br />4. Attend the bid opening. <br />PHASE FOUR <br />CONSTRUCTION ADNIINISTRATION: <br />Scope of Basic Services <br />The services provided during this phase shall generally be intended to assist the City construction <br />manager in the administration of the construction contract as set forth in the Conditions of the <br />Contract for Construction of the Project. The services to be provided shall include the following: <br />1. Attend a pre -construction meeting and respond to questions from the construction <br />contractor and sub -contractors. <br />2. Attend one construction meeting per week, at a time and location to be determined by the <br />City construction manager, to review relevant project issues and to become generally <br />familiar with the progress and quality of the Work and to determine in general if the <br />Work is proceeding in accordance with the Contract Documents. <br />3. Visit the constriction site as may be required by the City construction manager to address <br />technical issues and site conditions which may arise from time to time during the <br />construction of the Work. Such visits to the construction site shall be made with <br />reasonable promptness as to cause no delay in the construction of the Work. <br />4. Prepare and distribute reports and communications to the City construction manager to <br />indicate the general progress and quality of the Work and to endeavor to guard the City <br />against defects and deficiencies in the Work based on the observations made during visits <br />to the construction site. <br />5. Review and approve or take other appropriate action as may be necessary to check shop <br />drawings, product data and samples submitted by the construction contractor for <br />conformance with the information and the design concept indicated in the Contract <br />Documents. The review and approval or other action shall be taken with such reasonable <br />promptness as to cause no delay in the construction of the Work, while allowing for <br />sufficient time to permit adequate review. The review of such submittal shall not be <br />conducted for the purpose of determining the accuracy and completeness of the other <br />detail such as dimensions and quantities or for substantiating instructions for installation <br />or performance of equipment or systems designed by the construction contractor, all of <br />which shall remain the sole responsibility of the construction contractor to the extent <br />required by the Contract Documents. The review shall not constitute approval of safety <br />precautions or, unless otherwise specifically stated by the construction contractor means, <br />Page 8 of 10 <br />Exhibit A <br />05/01/97 <br />