Laserfiche WebLink
<br />Consulting Services Agreement between City of San Leandro and RRM Design <br />for Memorial Park Improvements Exhibit A – Page 7 of 11 <br /> <br /> <br />Grading, Drainage and Stormwater Plans <br />The plans will show all vertical control of the project elements, contour <br />grading, spot elevations, and cut and fill estimates within the project site. The <br />plans will detail all drainage facilities within the site. This scope is limited to <br />the project site only (approximately three acres) and assumes that the existing <br />off-site upstream and downstream storm drain infrastructure has adequate <br />capacity for the proposed site development, and analysis or upgrades to this <br />infrastructure is not included. Stormwater evaluation to include the following: <br /> <br />This project is assumed to create and/or replace between 10,000 square feet <br />and 43,559 square feet (0.99 acre) of impervious surface and is a C.3 <br />Regulated Project. CONSULTANT will design permanent stormwater <br />treatment in accordance with the C.3 Stormwater Technical Guidance (C.3 <br />Guide, February 2021). The design will utilize a combination of low impact <br />development (e.g., interceptor tree credits, self-retaining areas, self-treating <br />areas) and stormwater treatment measures (e.g., bioretention, pervious <br />pavements). CONSULTANT will prepare a City of San Leandro <br />Stormwater Requirements Checklist and C.3 sizing calculations <br /> <br />CONSULTANT will perform ten-year storm drainage analyses (hydrology <br />and hydraulic) for the project drainage and stormwater designs. The C.3 <br />calculations and exhibits, storm drain hydrologic/hydraulic calculations <br />and exhibits, reference documentation, and project narrative will be <br />provided in a comprehensive drainage and stormwater control plan <br /> <br />CONSULTANT will submit a draft version of the drainage and <br />stormwater control plan and the City of San Leandro Stormwater <br />Requirements Checklist with the 90% PS&E and the final version will be <br />submitted with the 100% PS&E <br /> <br />Stormwater Pollution Prevention Plan (SWPPP)_ <br />A project SWPPP is required for this project (more than one acre of disturbed <br />land). CONSULTANT will prepare plans for temporary erosion control <br />facilities. Temporary facilities will be proposed for the protection of graded <br />areas and drainage devices. Details and appropriate notes for construction best <br />management practices (BMP) and guidelines for implementation are proposed <br />to be in conformance with the State of California Water Resources Board <br />requirements and the approved staff report, including sediment control <br />recommendations. <br /> <br />DocuSign Envelope ID: 73B64E61-9591-470B-9CFE-9E9CD49407D4