My WebLink
|
Help
|
About
|
Sign Out
Home
CSA RRM Memorial Park CSA 07122022
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2022
>
CSA RRM Memorial Park CSA 07122022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2022 12:29:14 PM
Creation date
8/9/2022 12:29:03 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
7/12/2022
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Consulting Services Agreement between City of San Leandro and RRM Design <br />for Memorial Park Improvements Exhibit A – Page 8 of 11 <br /> <br />The temporary erosion-control plans will be incorporated into the project <br />improvement plans as well as into the project SWPPP. CONSULTANT will <br />conduct a risk determination based on the project’s topography, soil, schedule, <br />location, and receiving water then prepare the SWPPP based on the project- <br />specific risk level. The SWPPP will be based on the 100% PS&E submittal. <br />This task includes preparing permit registration documents using the SMARTS <br />database for certification by the Client and submittal to the Water Boards. The <br />City will initiate the project in SMARTS. This task does not include <br />construction monitoring, QSP services, or SWPPP updates during construction. <br /> <br />Construction Plan <br />Construction plans for the park-design layout with a keynoting system that <br />identifies all construction items, references to appropriate details, and <br />drawing series directions. This plan will include and annotate all site <br />features, play equipment, hardscape, paving materials, ramps, handrails, <br />fences, and lighting. Design assumes Fire Department will utilize the <br />existing parking lot as the access road. The plan will also show parking lot <br />repaving, striping, and signage. The existing parking configuration and <br />layout will generally remain unchanged. <br /> <br />Site Electrical/Lighting Plans <br />CONSULTANT will prepare electrical service distribution plans, circuiting, <br />fixture schedules, panel schedules, and electrical calculations as required to <br />provide electrical service for site lighting, irrigation controller, and the <br />restroom in the park. Preparation of Title 24 Lighting compliance for exterior <br />lighting is included. This scope assumes that the existing on-site electrical <br />service is adequate for the proposed improvements and a new utility <br />application for the extension of new service is not required. Existing meter and <br />electrical panel are located on a building that is scheduled for demolition. <br />Work to include new meter and panel as appropriate. <br /> <br />Construction Details <br />Details for all construction items illustrated on the construction plans. The <br />details will specify materials, dimensions, colors, and finishes and will be <br />keyed to the plan. Pavement and flatwork design will be based on the project <br />geotechnical report’s recommendations. Project will utilize City-standard <br />plans and details for curb ramps, sidewalks, signs, driveways, and other <br />hardscape features. <br /> <br />Structural Details, Calculations, and Review <br />DocuSign Envelope ID: 73B64E61-9591-470B-9CFE-9E9CD49407D4
The URL can be used to link to this page
Your browser does not support the video tag.