My WebLink
|
Help
|
About
|
Sign Out
Home
CSA RRM Memorial Park CSA 07122022
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2022
>
CSA RRM Memorial Park CSA 07122022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2022 12:29:14 PM
Creation date
8/9/2022 12:29:03 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
7/12/2022
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Consulting Services Agreement between City of San Leandro and RRM Design <br />for Memorial Park Improvements Exhibit A – Page 9 of 11 <br /> <br />Structural plans, details, and calculations for park amenity features (i.e., seat <br />walls, sign footings). Consultant will provide review of prefabricated restroom <br />pad (restroom and pad designed by manufacturer’s structural engineer and <br />architect), prefabricated trash enclosure (assumed with roof), and shade <br />structure footings (footings designed by manufacturer’s structural engineer and <br />architect). Structural review of these prefabricated items will occur upon <br />receipt of manufacturer’s design drawings (anticipated during the 90% or <br />100% PS&E development). <br /> <br />Irrigation Plans and Details <br />Irrigation plans will detail the system layout, mainline, automatic controller, <br />head layout, piping, filter, and backflow device. In support of the irrigation <br />plans, Consultant will prepare irrigation details that specify the method of <br />construction and proper irrigation system component procedures. The <br />irrigation plan will comply with requirements in the State Model Water <br />Efficient Landscape Ordinance. <br /> <br />Planting Plans and Details <br />Layout of all planting indicating plant species, quantity, size and location of all <br />shrubs, ground cover, and trees. In support of the planting plans, Consultant <br />will prepare planting details that specify the method of construction and proper <br />planting procedures. The planting plan will comply with requirements in the <br />State Model Water Efficient Landscape Ordinance and will be SF bay friendly. <br /> <br />Specifications <br />Technical specifications (CSI format, Division 02 through 32, as applicable) <br />will be provided as part of the submittals listed in the tasks below. This <br />scope assumes the City will provide and assemble all general provisions <br />related to this project. Consultant to provide division 01 templates for <br />editing by City. 50% PS&E submittal will include outline specifications <br />only. <br /> <br />Construction Cost Opinions <br />Consultant, will prepare construction cost opinions for the park at the 50%, <br />90%, and final bid-ready stage. The detailed construction cost opinion will <br />break out each component of the design with item descriptions and unit <br />costs. Due to many variables surrounding bidding and construction <br />conditions, this opinion will not represent a guarantee that bids received will <br />be equal to the opinion. Unit costs will use recent project bid data and City- <br />provided cost data. <br /> <br />DocuSign Envelope ID: 73B64E61-9591-470B-9CFE-9E9CD49407D4
The URL can be used to link to this page
Your browser does not support the video tag.