Laserfiche WebLink
<br />Consulting Services Agreement between City of San Leandro and RRM Design <br />for Memorial Park Improvements Exhibit A – Page 9 of 11 <br /> <br />Structural plans, details, and calculations for park amenity features (i.e., seat <br />walls, sign footings). Consultant will provide review of prefabricated restroom <br />pad (restroom and pad designed by manufacturer’s structural engineer and <br />architect), prefabricated trash enclosure (assumed with roof), and shade <br />structure footings (footings designed by manufacturer’s structural engineer and <br />architect). Structural review of these prefabricated items will occur upon <br />receipt of manufacturer’s design drawings (anticipated during the 90% or <br />100% PS&E development). <br /> <br />Irrigation Plans and Details <br />Irrigation plans will detail the system layout, mainline, automatic controller, <br />head layout, piping, filter, and backflow device. In support of the irrigation <br />plans, Consultant will prepare irrigation details that specify the method of <br />construction and proper irrigation system component procedures. The <br />irrigation plan will comply with requirements in the State Model Water <br />Efficient Landscape Ordinance. <br /> <br />Planting Plans and Details <br />Layout of all planting indicating plant species, quantity, size and location of all <br />shrubs, ground cover, and trees. In support of the planting plans, Consultant <br />will prepare planting details that specify the method of construction and proper <br />planting procedures. The planting plan will comply with requirements in the <br />State Model Water Efficient Landscape Ordinance and will be SF bay friendly. <br /> <br />Specifications <br />Technical specifications (CSI format, Division 02 through 32, as applicable) <br />will be provided as part of the submittals listed in the tasks below. This <br />scope assumes the City will provide and assemble all general provisions <br />related to this project. Consultant to provide division 01 templates for <br />editing by City. 50% PS&E submittal will include outline specifications <br />only. <br /> <br />Construction Cost Opinions <br />Consultant, will prepare construction cost opinions for the park at the 50%, <br />90%, and final bid-ready stage. The detailed construction cost opinion will <br />break out each component of the design with item descriptions and unit <br />costs. Due to many variables surrounding bidding and construction <br />conditions, this opinion will not represent a guarantee that bids received will <br />be equal to the opinion. Unit costs will use recent project bid data and City- <br />provided cost data. <br /> <br />DocuSign Envelope ID: 73B64E61-9591-470B-9CFE-9E9CD49407D4