My WebLink
|
Help
|
About
|
Sign Out
Home
10E Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2022
>
Packet 10172022
>
10E Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2025 1:53:56 PM
Creation date
10/13/2022 1:29:56 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
10/17/2022
Retention
PERM
Document Relationships
Reso 2022-183 Amendment 3 Kleinfelder (SR and RES)
(Amended)
Path:
\City Clerk\City Council\Resolutions\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Attachment B – Kleinfelder Amendment 3 Scope of Work <br />Page 1 of 2 <br />Attachment B Amendment 3 Scope of Work <br /> <br />The following is a summary of the revised ‘Scope of Work’ that will be included in the Contract Services <br />Agreement Amendment Number 3 with Kleinfelder for the Washington Manor Park Irrigation Well <br />Replacement Project, Project No. 2022.3060: <br /> <br />1. Section 1.1 of the Agreement entitled “Term of Services” is hereby amended to extend the <br />term from December 31, 2021, to June 30, 2023; and <br /> <br />2. Exhibit A of the Original Agreement entitled “Scope of Services” is hereby amended to add the <br />following text at the end of the section: <br /> <br />Add the following paragraph at the end of the section for Task 1: Well Plans and Specifications: <br /> <br />• Meet with City Staff to review comments and confirm revisions to be incorporated <br />into the last progress PS&E submittal received in September, 2021. <br />• Provide a demolition plan to remove existing 8” diameter irrigation well, well pad <br />and enclosure <br />• Incorporate additional detailed performance specifications and project <br />requirements as needed for bidding of deferred submittal items to be completed <br />by contractor, other items needed to complete a replacement irrigation well. <br /> <br />Add the following paragraph at the end of the section for Task 2: MEP Plans and Specifications: <br /> <br />• Meet with City Staff to review comments and confirm revisions to be incorporated <br />into the last progress PS&E submittal received in September, 2021. <br />• Incorporate detailed performance specifications and project requirements as <br />needed for bidding of deferred submittal items to be completed by the contractor; <br />including submersible well pump, riser pipe, variable frequency drive, pump <br />controllers, and controls, and all other items needed to complete a replacement <br />irrigation well. <br /> <br />Add new Tasks 5 and 6 as follows: <br /> Task 5 – Well Construction Management (CM) <br />During construction of the water supply well, Kleinfelder staff will be on-site and available to communicate with City <br />staff and the drilling contractor during crucial periods of the well construction task as detailed in the drilling and well <br />construction specifications. <br /> <br />Task 5a - Drilling, Design, Installation, and Development <br />Experience has shown that critical times during drilling and construction require experienced management. <br />Kleinfelder staff will be onsite to observe and monitor the contractors work during at critical times during construction, <br />including: <br /> <br />• Conductor casing placement <br />• Drilling fluid management <br />• Geophysical log (E-log) interpretation <br /> • Seals placement <br />• Well development <br />• Production testing
The URL can be used to link to this page
Your browser does not support the video tag.