My WebLink
|
Help
|
About
|
Sign Out
Home
10E Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2022
>
Packet 10172022
>
10E Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2025 1:53:56 PM
Creation date
10/13/2022 1:29:56 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
10/17/2022
Retention
PERM
Document Relationships
Reso 2022-183 Amendment 3 Kleinfelder (SR and RES)
(Amended)
Path:
\City Clerk\City Council\Resolutions\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Attachment B – Kleinfelder Amendment 3 Scope of Work <br />Page 2 of 2 <br />• Zone testing <br />• Well screen placement <br />• Filter pack placement <br />• Water quality testing <br />• Final video inspection <br />• Sanitization/chlorination <br /> <br />Task 5b - Final Well Design Recommendations <br />Following the completion of the test boring, lithologic logging and E-logging, Kleinfelder will provide a detailed <br />interpretation of the data to refine which zone(s) for potential production quality and blending and provide a final well <br />design with the appropriate well screen placement commensurate with water quality and production potential. This <br />will be done in one day. As part of the final design, we will evaluate and provide engineering recommendations for <br />pump type, placement (depth), and operation. <br /> <br />Task 5c - Reporting <br />After the completion of the well construction, Kleinfelder will prepare a report summarizing well construction and <br />document adherence to the well drilling specifications by the drilling contractor. The report will include a description <br />of the following: <br /> <br />• Narrative of well drilling methodology/procedure, <br />• Well location graphically depicted, <br />• Lithology encountered and graphically displayed on boring log, <br />• As-built diagram showing well construction, <br />• Pumping test results, <br />• Description of aquifer parameters using 2-dimensional aquifer modeling software (Aqtesolv), <br />• Description of water quality and comparison to water quality goals, <br />• Pump and pump setting recommendations, <br />• Supporting documents: Geophysical logs, Grain size analysis, Certified water quality laboratory results <br /> <br /> <br />Added the following paragraph at the end of the Schedule Section: <br /> <br />Amendment 3 Deadlines: <br /> <br />Meeting with City Staff 2 Weeks after approval of Amendment 3 <br />Deliver revised 100% PS&E 6 Weeks after approval of Amendment 3 <br />Deliver final signed bid documents 8 Weeks after approval of Amendment 3 <br />Well Construction Management Kleinfelder shall accommodate the work schedule of the City’s <br />contractor. Work is projected to start in spring 2023, but could change <br />depending on the time period for the bid and award process. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.