My WebLink
|
Help
|
About
|
Sign Out
Home
EBCE-San_Leandro_EV_Charger_Site_License_Agreement_Final.pdf
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2022
>
EBCE-San_Leandro_EV_Charger_Site_License_Agreement_Final.pdf
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2024 12:05:13 PM
Creation date
12/18/2022 11:41:39 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Execution Version <br />Exhibit B - 3 <br />Automatic Load Management System and Energy System Functionality: <br />● Equipment must have a “fail safe” design in that if the local computer fails, the chargers still work <br />but will not overload the available power. The Automatic Load Management System (“ALMS”) <br />must be able to function independently to ensure that circuits and the electrical service are not <br />overloaded when there is no WAN or internet connectivity and without the requirement for back <br />office services from any particular provider. <br />● EBCE requires a system that allows EBCE to measure and manage energy usage easily, <br />remotely, and in real-time, including the following functionality: <br />○ Remotely monitor, manage and configure EVSE; <br />○ Monitor and report real-time status of EVSE, including readiness, errors, or maintenance <br />needs. <br />DATA AND BACK OFFICE <br />Term and Warranty: <br />● Back office services for five (5) years commencing on the system’s commercial operation date, <br />with sub-sequential one (1) year extensions at EBCE’s option. <br />Back Office Services: <br />● Back office services must be provided and shall include data collection, storage, analysis, <br />reporting, and software interfaces as necessary to enable required and desired EVSE system <br />functionality, such as: <br />○ Initiating/validating/terminating user charging sessions; <br />○ User account management and customer service; <br />○ Configuring EVSE and/or back office services software to charge complex and varying fee <br />structures; <br />○ Be able to bill based on kWh sales (time of day dependent) and time-based charging (by <br />the minute and time of day). Ability to bill different groups at different rates. Systems must <br />include the option of accessing services using an RFID or any vendor proposed option. <br />○ Open standards back office (OCCP 1.6 or higher compliant). The charging system should <br />support third party, open standard back-office company for billing and customer service if <br />Contractor is no longer under contract with EBCE to provide that service. This functionality <br />shall not require additional funding by EBCE to reconfigure or replace infrastructure for a <br />different third-party provider should this occur. <br />● Back Office Services shall be provided from contract execution and for five years commencing on <br />the system's commercial operation date, with an option for EBCE to extend the back office <br />services in sub-sequential one (1) year terms. <br />● Contractor must complete the monthly back-office and billing cost summary for EVCS. <br />Payment Systems and Financial System Integration: <br />● Back office or network services shall process all transactions and revenue derived from payment <br />systems established at the site, including process and methods for transferring funds to EBCE. <br />● Terms and conditions shall include a detailed pricing of all transaction fees including set up, <br />monthly/annual network, transaction, and credit card processing. <br />● The Contractor shall have a system with the ability to integrate with EBCE’s financial applications <br />and Charging Station credit card reader. Support for additional packages should include, but not <br />be limited to: <br />○ Timeline for the receipt of funds from revenue generated by Charging Stations, <br />○ Consolidate and verify same terms for app and credit card reader, <br />○ Energy delivered, duration of charging, and amount paid by customer for each charging <br />session, <br />○ Summary monthly report showing total sales, total fees, and net revenue, <br />○ Ability to analyze EVCS revenues and usage by location, <br />DocuSign Envelope ID: 9A9D2499-76B9-48B0-8ECE-EF852438F252DocuSign Envelope ID: EC3D6FF2-1EAC-45AF-8666-F6EEFB410D6F
The URL can be used to link to this page
Your browser does not support the video tag.