Laserfiche WebLink
ATTACHMENT B <br /> <br />SCOPE OF SERVICES <br /> <br />and how these locations will enhance the data collection. <br /> Include Complete Streets and Active Transportation best practices and <br />recommendations and include a discussion of modal priority. <br /> Discuss how the Bicycle and Pedestrian Master Plan will be integrated with <br />adjacent jurisdictions’ bike and pedestrian plans, the ACTC Multimodal <br />Priorities, the Countywide Bicycle and Pedestrian Plans and the Regional <br />Bicycle and Pedestrian Plans, including policies, priorities, and funding. <br /> <br />• Updates to Chapter 3: Bicycle Network <br />o The consultant will update the Existing Bicycle Facilities and contents of the chapter <br />to reflect changes since the 2018 Bicycle and Pedestrian Master Plan. <br /> Update data, tables, figures, and maps, including information on the Regional <br />Bicycle Network. <br /> Update the Plan summarizing projects completed since the adoption of the <br />2018 Bicycle Master Plan. <br /> Update total miles of existing trails, bicycle lanes and routes. <br /> Update maps and descriptions of existing and proposed bicycle transportation <br />facilities. All recommended bikeway facilities will incorporate Appendix C <br />“Bikeway Facility Classification” of the Alameda CTC Local Bicycle Master <br />Plan Guidelines into the proposed plan. <br /> Discuss with City staff and BPAC options of keeping or eliminating the <br />bicycle routing numbering system, which is in the existing plan but has never <br />been implemented. <br /> Designate and map an “all age and abilities” bike network defined in <br />Appendix C of the Alameda CTC Local Bicycle Master Plan Guidelines into <br />the proposed plan. <br /> Add a map and description of major barrier/gap closure projects (bridges, <br />freeway crossings, major arterial crossings, etc.). <br /> Update and coordinate with Complete Street policies information of design <br />guidelines the City uses for bikeway geometry, striping, and traffic control <br />devices. <br /> Add information and/or a map of the existing Bicycle Parking Locations <br /> Add a map and description of existing and proposed bicycle transport and <br />parking facilities at transit terminals. <br /> Add information of the past implementation of bicycle programs and <br />expenditures that may be optionally located in this Chapter 3 or Chapter 6, <br />Implementation. <br /> Add information about the estimated number of existing bicycle trips in the <br />plan area, both in absolute numbers and as a percentage of all trips. <br /> <br />• Updates to Chapter 4: Pedestrian Network <br />o The consultant will update the Existing Pedestrian Facilities and contents of the <br />chapter to reflect changes since the 2018 Bicycle and Pedestrian Master Plan. <br /> Update a map and descriptions of pedestrian improvement areas and key <br />pedestrian locations, including identifying typical improvements in these key