My WebLink
|
Help
|
About
|
Sign Out
Home
5B Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2023
>
Packet 20230905
>
5B Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2024 5:54:18 PM
Creation date
9/19/2023 4:30:54 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT B <br /> <br />SCOPE OF SERVICES <br /> <br />areas. Many of these improvement areas can be identified by referring to other <br />City planning documents. <br /> Update Citywide improvement plans and programs. <br /> <br />• Updates to Chapter 5: Safety, Education and Enforcement <br />o The consultant will update contents of the chapter to reflect changes since the 2018 <br />Bicycle and Pedestrian Master Plan. <br /> Update a map and information concerning the number and location of <br />collisions, serious injuries, and fatalities suffered by bicyclists and pedestrians <br />in the plan area, both in absolute numbers and as a percentage of all trips. <br /> Update information concerning education and encouragement programs for <br />bicyclists and pedestrians. <br /> Update components of Safe Routes to School, Safe Routes to Transit, and <br />Security. <br /> Update information on Enforcement. <br /> <br />• Updates to Chapter 6: Implementation <br />o The consultant will update contents of the chapter to reflect changes since the 2018 <br />Bicycle and Pedestrian Master Plan. <br /> Update project prioritization. <br /> Update information of bicycle and pedestrian project coordination. <br /> Update high priority projects. <br /> Update expenditures. <br /> Update bikeway facility costs. <br /> Update Funding strategies. <br /> Update implementation strategies. <br /> <br />• Updates Design Standards <br />o The consultant will coordinate with the City’s Complete Streets policies and update <br />the contents of the chapter to reflect changes since the 2018 Bicycle and Pedestrian <br />Master Plan. The Consultant will update the general design standards for bikeway <br />and sidewalk design. A graphic of each item and text discussion of application of the <br />standards or recommendations should be included. These standards will include, but <br />are not limited to, the following: <br /> Update width requirements for all bikeway, trail and sidewalk <br />classifications. <br /> Update design of bike lanes and trails at intersections. <br /> Update recommendations for bicycle detection. <br /> Update recommendations for striping and signing. <br /> Update recommendations for types of bicycle parking, placement of bicycle <br />parking. <br /> Update details of bicycle parking and establish new bicycle parking <br />requirements for various land development types.
The URL can be used to link to this page
Your browser does not support the video tag.