My WebLink
|
Help
|
About
|
Sign Out
Home
5B Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2023
>
Packet 20230905
>
5B Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2024 5:54:18 PM
Creation date
9/19/2023 4:30:54 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT B <br /> <br />SCOPE OF SERVICES <br /> <br /> Update standards for typical pedestrian improvements (i.e., bulb-outs, <br />median pedestrian refuges, enhanced lighted crosswalks, pedestrian traffic <br />signal, etc.). <br /> Update crosswalk criteria to include Prioritization Policy that will address <br />citizens’ requests and program the project implementation. <br /> Update information concerning accessibility issues. <br /> Update information on creek trail standards. <br /> Add any other best practices that can further enhance and improve the <br />Design Guidelines. <br /> <br />• Update Trails and Bikeways User Map <br />o The Consultant will update a user friendly, easy to read user map that will indicate <br />suitability ratings and the location of all trails and bikeways, as well as support <br />facilities (i.e., bicycle parking) and recreation and activity centers. If the bikeway <br />numbering system is decided to remain in the Bicycle and Pedestrian Plan, the <br />Consultant will update Route/Trail numbers which are consistent with that of the City <br />of Oakland and County of Alameda. This map will be distributed to the public as a <br />guide to local trails and bikeways. <br /> One side of the map will have the locations of the trails and bikeways while <br />the other side of the map will have educational tips regarding bicycle safety <br />and rules, and other pertinent information to be determined by City staff and <br />the Consultant. <br /> <br />• Format and Deliverables for the Bicycle and Pedestrian Master Plan <br />o It is the responsibility of the consulting team to provide a first draft (initial), second <br />draft (administrative draft), third draft (public review), and a fourth adopted or final <br />version of the Citywide Bicycle and Pedestrian Master Plan. In order to reduce <br />printing costs, all documents will be primarily distributed to the public in PDF format. <br />All deliverables and work produced by the consulting team for the Bicycle and <br />Pedestrian Master Plan, whether in hard copy or electronic form, is public record and <br />the property of the City, and may be freely copied, modified, and distributed. <br />o Electronic Format <br /> All documentation shall be submitted to the City in a compatible electronic <br />format to include Microsoft Word and Portable Document Format (.pdf). <br />Administrative Draft and later versions shall include a “redline” copy which <br />identifies any changes or deletions from the previous version. The draft and <br />final Bicycle and Pedestrian Plan will be distributed for comments in a digital <br />format and be made available for download from the City website. City staff <br />shall be responsible for the cost of printing, mailing, and distributing all public <br />notifications. The City shall provide printed copies of the plan upon request <br />for public and outside agency comment through the Printing Services division. <br />o Print Format <br /> A minimum of thirty printed copies in a loose-leaf binder format and one <br />reproduction copy (un-punched) shall be provided for the third draft (public <br />review) and final (adopted) versions. These printed versions shall be used by
The URL can be used to link to this page
Your browser does not support the video tag.