<br />Consulting Services Agreement between City of San Leandro and 6 November 2023 <br />Schaaf and Wheeler for Trash Load Reduction Planning Exhibit A – Page 4 of 5 <br />the final design alternatives selected and will be determined after completion of <br />the Basis of Design report. Costs for completion of any necessary additional <br />regulatory permits, supporting studies, and documentation would be completed <br />as a negotiated change order to this contract. <br /> <br />Tasks 2.4 - 2.7 Design Documents <br />This task involved the preparation of construction bid documents for the selected trash <br />capture devices recommended by the Basis of Design Report from Task 1.5 and <br />assumes all 6 trash capture devices would be included in one bid package. This task <br />includes, but is not limited to the following items: <br />• Concurrently with field investigations, 30% PS&E (Plans, Specifications, and <br />Estimate) will be developed for review by the City to identify proposed <br />structures, project configuration, coordination items, maintenance, and <br />construction access. Assumes a table of specification contents. <br />• Submittal of 70% / 100% PSE. Construction drawings are to be furnished in <br />AutoCAD using City format. Technical specifications are to be prepared in MS <br />Word, in accordance with the Construction Specifications Institute (CSI) format. <br />City to prepare front end special provisions. Dewatering plan and water pollution <br />control plan specification sections will be developed to provide guidance and <br />limitations to the contractor as part of the bid packages. <br />• Geotechnical engineer will review 100% design plans for concurrence. <br />• Incorporate recommendations and comments from City review. <br />• Structural engineering design work will be determined after completion of the <br />Basis of Design Report. It is anticipated that structural engineering would only <br />be required should outfall alternatives be selected for design. If such structural <br />design is necessary, it would be completed as a negotiated change order to this <br />contract <br /> <br />Task 2.7 Bid Support <br />Provide Bid Support, responding to bidder RFI’s, and issuing addenda. <br /> <br /> <br /> <br /> <br />