My WebLink
|
Help
|
About
|
Sign Out
Home
5B Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2023
>
Packet 20231106
>
5B Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2024 5:56:36 PM
Creation date
12/15/2023 1:16:17 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
11/6/2023
Retention
PERM
Document Relationships
Reso 23-146 CSA Schaaf and Wheeler for design of Stormwater Trash Capture Devices
(Amended)
Path:
\City Clerk\City Council\Resolutions\2023
Schaaf & Wheeler CSA 20231106
(Amended)
Path:
\City Clerk\City Council\Agreements\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Consulting Services Agreement between City of San Leandro and 6 November 2023 <br />Schaaf and Wheeler for Trash Load Reduction Planning Exhibit A – Page 4 of 5 <br />the final design alternatives selected and will be determined after completion of <br />the Basis of Design report. Costs for completion of any necessary additional <br />regulatory permits, supporting studies, and documentation would be completed <br />as a negotiated change order to this contract. <br /> <br />Tasks 2.4 - 2.7 Design Documents <br />This task involved the preparation of construction bid documents for the selected trash <br />capture devices recommended by the Basis of Design Report from Task 1.5 and <br />assumes all 6 trash capture devices would be included in one bid package. This task <br />includes, but is not limited to the following items: <br />• Concurrently with field investigations, 30% PS&E (Plans, Specifications, and <br />Estimate) will be developed for review by the City to identify proposed <br />structures, project configuration, coordination items, maintenance, and <br />construction access. Assumes a table of specification contents. <br />• Submittal of 70% / 100% PSE. Construction drawings are to be furnished in <br />AutoCAD using City format. Technical specifications are to be prepared in MS <br />Word, in accordance with the Construction Specifications Institute (CSI) format. <br />City to prepare front end special provisions. Dewatering plan and water pollution <br />control plan specification sections will be developed to provide guidance and <br />limitations to the contractor as part of the bid packages. <br />• Geotechnical engineer will review 100% design plans for concurrence. <br />• Incorporate recommendations and comments from City review. <br />• Structural engineering design work will be determined after completion of the <br />Basis of Design Report. It is anticipated that structural engineering would only <br />be required should outfall alternatives be selected for design. If such structural <br />design is necessary, it would be completed as a negotiated change order to this <br />contract <br /> <br />Task 2.7 Bid Support <br />Provide Bid Support, responding to bidder RFI’s, and issuing addenda. <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.