My WebLink
|
Help
|
About
|
Sign Out
Home
5B Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2023
>
Packet 20231106
>
5B Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2024 5:56:36 PM
Creation date
12/15/2023 1:16:17 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
11/6/2023
Retention
PERM
Document Relationships
Reso 23-146 CSA Schaaf and Wheeler for design of Stormwater Trash Capture Devices
(Amended)
Path:
\City Clerk\City Council\Resolutions\2023
Schaaf & Wheeler CSA 20231106
(Amended)
Path:
\City Clerk\City Council\Agreements\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
File Number: 23-385 <br />·Policy EH-4.1 Urban Runoff Control: Continue to implement water pollution control <br />measures aimed at reducing pollution from urban runoff. These measures should <br />emphasize best management practices by residents, businesses, contractors, and public <br />agencies to ensure that surface water quality is maintained at levels that meet state and <br />federal standards. <br />·Action EH-4.1.A: Trash Capture Devices Develop a funding plan for the installation and <br />maintenance of trash capture devices on City storm drains, in order to comply with the <br />unfunded State mandate for 100 percent trash capture in local storm drain systems. <br />·Policy EH-4.5 Public Works Maintenance. Continue, and if feasible expand, City Public <br />Works maintenance activities, including scheduled street sweeping and cleaning of storm <br />drains and culverts, to minimize pollution from surface runoff. <br />Permits and/or Variances Granted <br />Appropriate permits will be obtained for this work before construction of the project. The exact <br />agencies will be determined based on the design details, but may include permits and approvals <br />from the following agencies: <br />·San Leandro Community Development Department, Building Division <br />·Alameda County Flood Control District <br />·Alameda County Department of Environmental Health <br />·Army Corps of Engineers (including consultations with the U.S. Fish and Wildlife Service) <br />·Bay Conservation and Development Commission (BCDC) <br />·San Francisco Bay Regional Water Quality Control Board (RWQCB) <br />Environmental Review <br />Environmental review for this project will be performed per the California Environmental Quality <br />Act (CEQA) after completion of the design. <br />Code Compliance Review <br />Code compliance will be reviewed as appropriate during the construction permit review process <br />with the San Leandro Community Development Department. <br />Financial Impacts <br />The cost of this contract, including potential contract amendments is $877,500. <br />The projected cost for the present project phase is as follows: <br />Consultant Contract for TCD Design $675,000 <br />Consultant contract - Trash Load Reduction Plan $75,000 <br />Installation of storm drain inlet screens (allowance)$80,000 <br />Contingencies $202,500 <br />Project management (City staff allowance)$58,800 <br />Total Cost:$1,091,300 <br />Page 3 City of San Leandro Printed on 11/1/2023
The URL can be used to link to this page
Your browser does not support the video tag.