Laserfiche WebLink
<br /> 11 <br />x Work with Subject Matter Experts ("SMEs") and IT teams (Server, Storage, <br />Network, Applications, etc.) to understand process, operational and technical <br />details of the environment. <br />x Identify relevant Nexus best practice deployment methodologies and use cases to <br />minimize Customer challenges. <br />x Identify the expected business and technical outcome based for this project. <br />x Review and obtain the site technical requirements with the Customer. <br />x Create a valid design document based on the Customer’s hardware and software <br />configuration. <br />High Level Implementation Tasks <br />ConvergeOne will install Cisco switches based on these tasks: <br />x Rack and stack <br />x Connect all cables <br />x Configure management network <br />x Confirm that the firmware is at the approved version, update as necessary <br />x Configure networking as per the design <br />x Configure uplinks connectivity <br />x Configure downlinks connectivity <br />x Configure VLANs <br />x Configure Interfaces <br />x Configure L2 Switching <br />x Configure security settings (as needed) <br />x Configure Analysis tools, alerts, and monitoring (as needed) <br />Virtualization Services <br /> VMWare Virtualization Configuration Services <br />Hypervisor Management Deployment <br />ConvergeOne will deploy a new vCenter platform. <br />ConvergeOne will deploy vCenter in HA configuration. <br />ConvergeOne will create 1 clusters for hypervisor hosts in the management platform. <br />DocuSign Envelope ID: F142FC13-2565-4871-97AE-5ACD1BA331FC