My WebLink
|
Help
|
About
|
Sign Out
Home
Silman Industries NPSA 20231212
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2023
>
Silman Industries NPSA 20231212
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2023 2:39:25 PM
Creation date
12/26/2023 2:39:08 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
12/12/2023
Retention
PERM
Document Relationships
5D Consent
(Amended by)
Path:
\City Clerk\City Council\Agenda Packets\2023\Packet 20231106
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Non-Professional Services Agreement between <br />City of San Leandro and Silman Industries—Exhibit A Page 5 of 30 <br />Remove all contrast markings, perform spot repairs of concrete along the stairs, and concrete <br />treatment to improve appearance and smoothness. Surface shall be slip resistant. <br />Task 4: Safety Corrections <br />Contractor shall modify or replace all hooks, puncture hazards, and open ends to comply to <br />described safety standards in task 6. Contractor shall furnish and install signage as needed. <br />Task 5: Miscellaneous repairs <br />Contractor shall repair Gate hinge which has incompatible bolt, remove string based secure <br />mechanism and install new gate lock and replace Screen. <br />Task 6: Total Rust and Paint removal of structure and surrounding fence <br />Strip off all paint, rust, or rust stains from all steel, painted elements, and concrete. <br />Task 7: Paint Structure and fence <br />Task includes all required testing, prep, stripe coat, and paint layers. <br />Paint color selection will be determined at a later date. Paint the slide but exclude the fiberglass <br />portion. <br /> <br />Task 1 & Task 2 - Demolition and Installation of “Landing” and “Platform” <br />General: <br /> <br />a) Contractors shall schedule and coordinate the Work of subcontractors, suppliers, and other individuals or <br />entities performing or furnishing any of contractor’s Work. <br />b) Contract is solely responsible for quality control to ensure that the work complies with the contract <br />documents, and said duty shall not be voided by any act or omission on the part of the inspector(s). <br />Materials: <br /> <br />Concrete: <br />c) Type V cement <br />d) Compressive strength of minimum of 5000 PSI <br />e) Min Cementous material of 750 <br />f) Air entrapment max 4% +/- 1% <br />g) Slump 3 ½” prior to additives, 4” +/- 1” with additives <br />h) Max 1/2” aggregate <br />Steel Deck: (Corrugated Sheet Metal) : Use “DEK-ING’s Composite metal Deck B/PLB formlok (11/2 <br />”composite) or Equivalent <br />DocuSign Envelope ID: 23227C11-F678-4CF3-95AF-AD4B0DEB1E28
The URL can be used to link to this page
Your browser does not support the video tag.