My WebLink
|
Help
|
About
|
Sign Out
Home
Silman Industries NPSA 20231212
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2023
>
Silman Industries NPSA 20231212
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2023 2:39:25 PM
Creation date
12/26/2023 2:39:08 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
12/12/2023
Retention
PERM
Document Relationships
5D Consent
(Amended by)
Path:
\City Clerk\City Council\Agenda Packets\2023\Packet 20231106
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Non-Professional Services Agreement between <br />City of San Leandro and Silman Industries—Exhibit A Page 4 of 30 <br />Contractor’s own risk. Work performed utilizing rejected processes, equipment, or materials will be <br />removed, repaired, or redone to the satisfaction of the Engineer and at the Contractor’s expense. <br /> <br />Contractor shall submit the following to the Engineer: <br /> <br />1) San Leandro Business License for contractor and subcontractors <br />2) List Subcontractors <br />3) Staging Plan <br />4) Schedule <br />a. Contractor may use Microsoft Project or other scheduling software subject to the <br />approval of the Engineer. A pdf of the schedules and updated schedules shall be <br />submitted. <br />The Contractor shall submit a schedule within three working days of NTP. The <br />Contractor shall provide weekly updates of the schedule for the duration of work. <br /> <br />5) Schedule of values <br />6) Paint swatches/ procedure <br />7) Rust Coat warranty <br />8) Rust removal material specs/procedure <br />9) Welding material/procedure <br />10) Rebar/Concrete reinforcement <br />11) Decking <br />12) Concrete Mix Design <br />13) Additives <br />14) Maintenance Manual <br /> <br />Deliverables: <br /> <br />It is the contractor’s responsibility to complete all tasks, which includes all necessary work to <br />complete them. Task descriptions convey intent of work and bidding shall incorporate any <br />required material, labor, or equipment to accomplish final product at no additional cost. Tasks <br />should be completed in order they are numbered, unless otherwise approved by the engineer. <br />All Tasks shall be constructed according to as-builts as referenced. Original as-built plans may <br />be provided upon request. If conflict exists, attachment A shall govern. <br /> <br />Task 1: Demolition and Installation of “Landing” per as built details with modifications <br />Demolish and reconstruct the landing located at the end of the first flight of stairs on the structure <br />and protect existing structure. Do not demolish the structural W- Beams to which the landing is <br />welded. Remove rust from the W-beam and other non-structural treatments. Work shall include <br />all other necessary repairs or modifications to the fasteners, bolts and other accessories related <br />to the W-Beams and other structural components. <br />Task 2: Demolition and Installation of “Platform” per as built details with modifications. <br />Demolish and reconstruct the second flight Platform and protect existing structures. Remove <br />rusts on the W-Beams and other non-structural treatments. Perform all other necessary repairs <br />and/or modifications to the fasteners, bolts and other accessories related to the W-Beams and <br />other structural components. <br />This task shall include shoring of the slide. Shoring shall be required when removing the slide <br />from existing platform, and until completion of new Platform. <br />Task 3: Stair Rehabilitation <br />DocuSign Envelope ID: 23227C11-F678-4CF3-95AF-AD4B0DEB1E28
The URL can be used to link to this page
Your browser does not support the video tag.