<br /> <br />Non-Professional Services Agreement between <br />City of San Leandro and Silman Industries—Exhibit A Page 4 of 30 <br />Contractor’s own risk. Work performed utilizing rejected processes, equipment, or materials will be <br />removed, repaired, or redone to the satisfaction of the Engineer and at the Contractor’s expense. <br /> <br />Contractor shall submit the following to the Engineer: <br /> <br />1) San Leandro Business License for contractor and subcontractors <br />2) List Subcontractors <br />3) Staging Plan <br />4) Schedule <br />a. Contractor may use Microsoft Project or other scheduling software subject to the <br />approval of the Engineer. A pdf of the schedules and updated schedules shall be <br />submitted. <br />The Contractor shall submit a schedule within three working days of NTP. The <br />Contractor shall provide weekly updates of the schedule for the duration of work. <br /> <br />5) Schedule of values <br />6) Paint swatches/ procedure <br />7) Rust Coat warranty <br />8) Rust removal material specs/procedure <br />9) Welding material/procedure <br />10) Rebar/Concrete reinforcement <br />11) Decking <br />12) Concrete Mix Design <br />13) Additives <br />14) Maintenance Manual <br /> <br />Deliverables: <br /> <br />It is the contractor’s responsibility to complete all tasks, which includes all necessary work to <br />complete them. Task descriptions convey intent of work and bidding shall incorporate any <br />required material, labor, or equipment to accomplish final product at no additional cost. Tasks <br />should be completed in order they are numbered, unless otherwise approved by the engineer. <br />All Tasks shall be constructed according to as-builts as referenced. Original as-built plans may <br />be provided upon request. If conflict exists, attachment A shall govern. <br /> <br />Task 1: Demolition and Installation of “Landing” per as built details with modifications <br />Demolish and reconstruct the landing located at the end of the first flight of stairs on the structure <br />and protect existing structure. Do not demolish the structural W- Beams to which the landing is <br />welded. Remove rust from the W-beam and other non-structural treatments. Work shall include <br />all other necessary repairs or modifications to the fasteners, bolts and other accessories related <br />to the W-Beams and other structural components. <br />Task 2: Demolition and Installation of “Platform” per as built details with modifications. <br />Demolish and reconstruct the second flight Platform and protect existing structures. Remove <br />rusts on the W-Beams and other non-structural treatments. Perform all other necessary repairs <br />and/or modifications to the fasteners, bolts and other accessories related to the W-Beams and <br />other structural components. <br />This task shall include shoring of the slide. Shoring shall be required when removing the slide <br />from existing platform, and until completion of new Platform. <br />Task 3: Stair Rehabilitation <br />DocuSign Envelope ID: 23227C11-F678-4CF3-95AF-AD4B0DEB1E28